Veranda attached to the house - design projects and decoration of a modern terrace (60 photos). Reconstruction, or the history of budget construction from a FORUMHOUSE participant Rebuilding the veranda

Ordering design and construction from us dacha extension for a veranda, kitchen, boiler room, bathroom or living room, you can count on full cycle construction work. Each house reconstruction we carry out involves an individual approach, which takes into account both the personal wishes of the customer and the rationality of the order. Rationality means the choice of optimal building materials, such as foundation, roof, facade, as well as design and architectural features of the building, a list interior work. We guarantee high speed of development and implementation of the project, while ensuring impeccable quality of the services provided.

  • pile-screw foundation;
  • metal roofing;
  • fencing;
  • floor terrace board.

Cost of work: 55 thousand rubles. Cost of materials: 85 thousand rubles. Duration: 1 week.

Size: 3 x 6 meters. Basic option:

  • pile-screw foundation;
  • metal roofing;
  • exterior finishing: lining;
  • insulation;
  • window.

Cost of work: 110 thousand rubles. Cost of materials: 140 thousand rubles. Duration: 2 weeks.

Size: 3 x 6 meters. Basic option:

  • pile-screw foundation;
  • metal roofing;
  • exterior finishing: lining;
  • interior finishing: lining, batten;
  • insulation;
  • window.

Cost of work: 170 thousand rubles. Cost of materials: 205 thousand rubles. Duration: 3 weeks.

Superstructures over the house

The attic floor is a truly advantageous solution that allows you to expand the usable area of ​​the house without building side extensions. We will carry out the construction of an attic roof for you, as well as the construction of a roof of any configuration and complexity of the device attic floor or without. Our professionalism allows us to realize all customer wishes.

When constructing the second floor, frame (Finnish, Canadian) technology is mainly used, the main advantages of which include: light weight of structures, high thermal efficiency, speed of construction, lightness of internal and exterior finishing. Above the second floor there is usually a cold attic, which is also a warehouse. Before starting work, a study is carried out bearing capacity first floor walls and foundation. If necessary, we repair walls and foundations.

  • metal roofing;
  • exterior finishing: lining;
  • interior finishing: lining;
  • insulation;
  • window.

Cost of work: 140 thousand rubles. Cost of materials: 170 thousand rubles. Duration: 2 weeks.

Size: 6 x 6 meters. Basic option:

  • metal roofing;
  • exterior finishing: lining;
  • interior finishing: lining;
  • insulation;
  • window.

Cost of work: 150 thousand rubles. Cost of materials: 180 thousand rubles. Duration: 3 weeks.

Size: 6 x 6 meters. Basic option:

  • metal roofing;
  • exterior finishing: lining;
  • interior finishing: lining;
  • insulation;
  • window.

Cost of work: 160 thousand rubles. Cost of materials: 190 thousand rubles. Duration: 3 weeks.

Roof and attic reconstruction

Size: 6 x 6 meters. Basic option:

Cost of work: 35 thousand rubles. Cost of materials: 25 thousand rubles. Duration: 1 week.

Size: 6 x 6 meters. Basic option:

  • waterproofing;
  • counter-lattice;
  • sheathing;
  • installation of metal roofing.

Cost of work: 35 thousand rubles. Cost of materials: 45 thousand rubles. Duration: 1 week.

Size: 6 x 6 meters. Basic option:

  • insulation of roof slopes.

Cost of work: 15 thousand rubles. Cost of materials: 20 thousand rubles. Duration: 1 week.

Size: 6 x 6 meters. Basic option:

Cost of work: 20 thousand rubles. Cost of materials: 35 thousand rubles. Duration: 1 week.

Facade work

To insulate facades, foamed polystyrene foam, mineral and glass wool, foam glass, ecowool, polyurethane foam are used - the choice of materials today is quite wide. For mansard roofs also use different kinds and thickness of thermal insulation materials. We insulate the second floor of the dacha in three ways, depending on what time of year it is planned to be used: “spring-autumn”, “winter”, “ Cold winter" Based on this, the type of material, its thickness are selected and, accordingly, the price of the work is determined.

Size: 6 x 6 meters. Basic option:

  • siding.

Cost of work: 50 thousand rubles. Cost of materials: 50 thousand rubles. Duration: 1 week.

Size: 6 x 6 meters. Basic option:

  • insulation along guides.

Cost of work: 25 thousand rubles. Cost of materials: 25 thousand rubles. Duration: 1 week.

About the foundation country house repairs are required, you can guess if it loses its integrity and has visible chips and cracks. However, we often find out what is going on under the house itself only when the dacha is being rebuilt, and not normal repairs. In wetlands, where the soil tends to move, checking the integrity of the foundation and repairing it in a timely manner is vital.

Description: repair of the foundation of a house 6 x 6 meters.

Scope of work:

  • replacing the foundation with a new one;
  • foundation waterproofing;
  • foundation insulation;
  • blind area device;
  • foundation drainage;

Duration: 1 week. Price: 124 thousand rubles. Additionally: hanging the house.

Our specialists will carry out all the necessary repair, construction and finishing activities for your home in the shortest possible time, including major renovation country house.

Materials have a certain service life, after which it needs to be replaced or repaired; during operation, the need arises for a complete renovation of a country house.

Description: major renovation of a country house 6 x 6 meters.

Scope of work:

Duration: 1 week. Price: 82 thousand rubles. Additionally: replacement of windows and doors.

Reconstruction of a dacha is complex labor-intensive process, requiring special knowledge and skills. Our team will reconstruct your country house in full accordance with your requirements.

Adding a room or rebuilding an existing country house - our specialists can easily handle this. Reconstruction country houses- the main activity of our company.

Description: completion of a house 6 x 6 meters.

Scope of work:

  • facade works;
  • roofing;
  • Finishing work;
  • thermal insulation works;
  • arrangement of the frame, floor beams, rafter system;

Duration: 1 week. Price: 62 thousand rubles. Additionally: windows and doors.

After construction is completed, you can begin the exterior and interior decoration of the house. To ensure that there is always comfortable temperature, it is necessary to carry out insulation wooden house using modern materials and technologies.

In particular, good thermal insulation finishing of a wooden house takes place using mineral materials based on basalt. Such mineral wools are environmentally friendly, provide good thermal insulation and at the same time maintain the effect of a “breathing” dacha, that is, they provide indoor optimal humidity air. Exterior finishing and interior decoration of a wooden house can be done using wooden lining, block house, imitation timber and others natural materials. The addition of a veranda to the house made of natural wood and glazing also contributes to heat conservation.

Description: interior decoration of a house 6 x 6 meters.

Scope of work:

  • floor installation;
  • ceiling installation;
  • installation of walls and partitions;

Duration: 1 week. Price: 42 thousand rubles. Additionally: thermal insulation work.


Sorting: 30

Reconstruction is Alternative option when there is no money for new construction. A major refurbishment based on an existing structure is cheaper than a new one. Especially when there are skillful hands, a burning desire and a severe need to improve living conditions. U FORUMHOUSE member under the nickname Upravdom, they turned out to have golden hands, and the desire to live in their own house, and not in an apartment, couldn’t be hotter. Perhaps his experience will help others make up their minds, because a journey of thousands of kilometers always begins with the first step, and only those who walk can master it.

Stage one: purchasing a base, first modifications

As a result of a long search that lasted almost a year, our forum member became the happy owner of a house in a state of average neglect and a plot of about 10 acres. So, in stock:

  • total area – 60 square meters;
  • the main part is log walls, size 6 x 6 squares, solid;
  • extension – kitchen 4 x 6, backfill;
  • the roof is a combination of slate and metal, far from both practicality and aesthetics;
  • veranda – scrap for demolition;
  • heating - stove, old heaters, demolition.


The first priority for overwintering is restoration to a livable state. To implement it, the minimum is required: heating from scratch, normal wiring from the same level, sealed windows.

My father-in-law helped with the wiring; it was decided to entrust the installation of the stove with a well, as the most efficient one inside the house, to a professional. Still, the process is not easy, it has its own subtleties. It turned out that it was not so easy to find a stove maker; the result of the “demonstration performance” of the invited “master” was masonry on their own. Although the main assistant, my father, had strong doubts, after studying additional materials from all available sources, the process began.

Upravdom FORUMHOUSE Member

In short, my father and I built this stove! It still works, and works great. This was my first lesson that nothing is impossible, even if you don’t understand anything about it. You have to search, delve into it, figure it out, and everything will definitely work out.

The reconstruction was carried out at an emergency pace, after the main work and on weekends for two months. During this time, the partitions were dismantled, a room was separated into a nursery, and the stove was equipped with a heating system. I had to tinker with the glazing of the windows, but this labor-intensive stage was left behind. For improvement appearance, what was needed was whitewashed and tinted.

A housewarming party took place in October, and it was planned to test the house against frost and wind. Winter showed that there will be further reconstruction. The house is warm, no drafts or frost on the walls.

Stage two: veranda

After debates at home, they decided to build a new one on the site of the old veranda and combine it with summer kitchen and a utility room. Now that they are using them right up to the frost, they are not overjoyed that they decided to combine them. During the winter, building materials were purchased, a lot of information on the exciting issue was studied, a design option was chosen, dimensions were 3 x 10 m. Disassembly took only a day, the old wood broke easily.

The foundation was poured using a strip foundation; incorrect assembly of the formwork from the very bottom of the trench resulted in unnecessary expenditure of effort and time.


A concrete mixer was connected to the work, which interested many users. The unit is assembled by local craftsmen, it costs a decent amount, but it is not suitable for demolition. The foundation was based on standard layers of sand with gravel and compaction; the reinforcement was used whatever was available. It turned out that it was expensive to buy a special one, and it also took a long time to knit, so we made do with strengthening the corners along the way.

Laying cinder block walls - also with my own hands, the first time on such a scale and everything was successful, nothing cracked. The desire to save money led to the invention of a new method of attaching a single sheet of iron to a frame - with rivets. For beauty, the doors were given to polymer painting. It turned out durable, cheap, and cute. We used the savings to install plastic windows in the kitchen.

To protect himself from possible spontaneous combustion of coal in the utility room - which is unlikely, but anything can happen - the forum member laid a brick wall over a wooden wall. Moreover, I organized ventilation with four windows to avoid this. The walls were connected to the house, but the technology was far from correct, as the craftsman himself admits.

Upravdom FORUMHOUSE Member

The premises are adjacent to the main house. For the tie, nails were driven into each seam of the masonry. I didn’t really delve into it then, but now I know that this is not true, but everything stands still. The walls do not move relative to each other, there are no cracks.

The ceilings are made from a metal corner, old boards from the veranda were used on the ceiling in the corner and woodshed, and on top - chipboard sheets. A clean board was immediately put into the kitchen so that there would be no need to finish it. For insulation - thick cardboard and environmentally friendly insulation - clay, roofing made of corrugated sheets.

Come winter Upravdom I was engaged in the interior decoration of the constructed veranda - preparing the lining and sheathing the walls. We started living in the first finished room in the house in the spring.



Stage Three: Expand and Overlap

To expand the living space, a 16 x 16 beam was purchased for the occasion. However, after sitting for the winter, it became more like a propeller; the quality of the timber forced us to abandon its use for the extension. We bought a foam block, due to a catastrophic lack of time, hired craftsmen, the box was put out almost in a day - 4 x 10. We went into the winter without a roof, which we regretted in the spring, when the water level in the extension allowed the children to launch boats.


Although it was planned to start the season with the roof - remove the old one and cover the common one over the house and extension, the weather made adjustments. While the rains were rinsing, there was time for the bathroom, which had been waiting for the third year. A corner in the kitchen was allocated for it, half of the floor was dismantled, the rest was leveled, as it was skewed, and walls made of sand blocks were installed. At the same time, we redid the sewer system and poured screed under the bathroom.

Along the way, the extension was overgrown with partitions - it turned out to be two bedrooms and a substantial storage room. Both the forum member and his wife dreamed of this room.

Upravdom FORUMHOUSE Member

Exit to the pantry from the kitchen. I will say separately: the pantry is a DREAM! And both my wife’s and mine! How tired I am of jars, basins, bags of sugar, flour and other things in the kitchen. Everything always got in the way! Although the kitchen was 6 x 4 - before the bathroom was built, the household belongings were still in the way. There is also a wardrobe in the closet. There is still a lot of seasonal clothing in a private home.

Finally, the weather took pity and we started working on the roof. On your own, since the prices of mercenaries are off the charts, and some experience was gained during the construction of a bathhouse made of timber. The same thing that didn’t go to the extension, but it worked there. Dismantling did not create any problems here either; the roof was “blown away” in a day. It took another five days to assemble the rafter system.


Upravdom FORUMHOUSE Member

Anticipating slaps and kicks from the craftsmen for such a roof construction, I will say this – I did it consciously. My father’s roof just lies on top of his house. It’s been 25 years now. My rafter system is even stronger. I simply wouldn’t have enough time and energy to do all the armor belts, correct cuts, etc. alone. And, in general, the roof has already been tested by strong hurricanes. I hope these tests gave a 100% guarantee of the reliability of the design.

A galvanized profile sheet, unpainted, was used for the roof. Both cheaper and more practical, climatic conditions They “eat up” the most durable paint in a few years, so why waste money? Chipboard from the floor in the house was used for the gables.


After the roof was completed, despite the lack of finances and the attendant difficulties that the whole family bravely endured, the doors to the extension were cut, the windows were broken, and the renovation of the heating began. There are registers left, since the forum member has no confidence in radiators. They brought in a crew to plaster all the stone surfaces inside, and new extension– and outside.

Plastic windows throughout the house did not attract a craftsman, like the radiators, the choice was made in favor of modern double-glazed windows, but in wooden frames. All openings are trimmed and raised to general level. Windows were ordered in two stages, which resulted in discrepancies in color palette, clearly visible to the naked eye. That's why Upravdom advises everyone in such situations to order the entire volume at once. He did the same with the doors.



Stage four: finishing

Since the holidays have already been chosen, there are 100 square meters to be finished, and I don’t want to live in renovations for the next few years, I had to be puzzled by finding a finisher. Although it is difficult to find a generalist who can twist the plaster, lay the tiles, and glue the wallpaper, I was lucky, such a master was hired for a very reasonable amount. Scope of work: sew up all unplastered (wooden) parts and finish them, design and implement two-level ceilings, lay tiles, lay the finished floor.

Upravdom FORUMHOUSE Member

Together with the master, we came to the final decisions on finishing the rooms. But there were so many arguments with my wife, viewing thousands of photos of design solutions. There is so much information on your computer, organized into folders, you just have to get over it.

Nobody pushed the master in the neck, all possible help was provided, and therefore the quality of workmanship is at its best.





Stage five: facade and landscaping of the site

Describing all the vicissitudes of reconstruction is much easier and faster than experiencing them. The epic stretched for almost five years; the next stage after finishing was covering the house with siding. For decorative purposes we chose contrasting colors– light canvas and dark brown corners. The hired team of professionals, due to large “jambs”, did not deliver the project, and completed the work on their own. The base was lined with natural stone.

Throughout the years of reconstruction, the family lived in the house, moving from room to room as it became more refined. Despite the lengthy process, the result proves that it was worth it. Of course, how everything happened in reality does not fit into a dry description, but the difficulties did not force the forum member to give up the dream of his own home. Go for it, and you will succeed!

The entire cycle as presented by the author is on topic. Others, no less interesting projects– in the section The article may suggest original solution everyone who wants to get away from the standards. Well, the video is for lovers of natural materials and traditions.

1. Do I need permission to reconstruct a veranda and open terrace in a village house?

1.1. Dear Guest, Krasnoyarsk!
To carry out the Reconstruction of Home Ownership in a residential building, you must obtain from the Administration municipality written Permission (Article 51 of the Civil Code of the Russian Federation).

Good luck to you Vladimir Nikolaevich
Ufa July 24, 2018

2. The husband inherited the house through the court. According to the court decision, the area is 95 sq.m. Now BTI is not making those plans since we removed the veranda, that is, the area has changed. And they began reconstruction. How to do all the reconstruction and then go to court?

2.1. Yes, you can do that. Carry out reconstruction and legalize it through the court. Or you can get permission for reconstruction right away, if it’s not too late.

3. In 1989, part of the house was purchased with cold veranda. Somewhere in the early 90s it was covered with bricks and lengthened by a meter, and at the end of the 90s it was turned into a living space. Will this be considered unauthorized construction or reconstruction? And what documents are needed to file a lawsuit?

3.1. This will be a reconstruction, to confirm the legality of which and its compliance with construction and other standards will require construction and technical expertise, as well as the consent of neighbors and ownership of the land.

3.2. Your reconstruction is illegal.
The list of documents attached to the statement of claim is established by Art. 132 Code of Civil Procedure of the Russian Federation:
The following are attached to the statement of claim:

Its copies in accordance with the number of defendants and third parties;
a document confirming payment of the state duty;
power of attorney or other document certifying the authority of the plaintiff’s representative;

documents confirming the circumstances on which the plaintiff bases his claims, copies of these documents for defendants and third parties, if they do not have copies;

Evidence confirming the implementation of the mandatory pre-trial dispute resolution procedure, if such a procedure is provided federal law or by agreement;

Calculation of the amount of money recovered or disputed, signed by the plaintiff, his representative, with copies in accordance with the number of defendants and third parties.

Simply put, you need to attach documents confirming the circumstances that you will refer to in your statement of claim.

3.3. Good afternoon This is a reconstruction, but an unauthorized one. Perhaps you don't need a trial either. We need to look at the documents, if there are any. BTI passport from the 90s or 00s, then you can make changes based on them.
In any case, do not rush into court, try to collect documents as much as possible, it is also important that you have the right to lease or own the land.
You can show your existing documents and we will tell you where to apply.

Best wishes!

4. I want to know. We live in a private house, can we insulate the veranda in order to increase the living space? Will this be considered a home renovation? Do I need permission for this? And can this be done at the expense of swearing? capital?

4.1. This is a reconstruction, because... falls under clause 14 of Art. 1 of the Civil Code of the Russian Federation reconstruction of capital construction objects (except for linear objects) - changing the parameters of a capital construction object, its parts (height, number of floors, area, volume), including superstructure, restructuring, expansion of a capital construction object, as well as replacement and ( or) carrier restoration building structures capital construction project, with the exception of replacing individual elements of such structures with similar or other elements that improve the performance of such structures and (or) restoration of these elements
and art. 25 Residential Complex of the Russian Federation Reconstruction of premises in apartment building constitutes an installation, replacement or transfer utility networks, sanitary, electrical or other equipment requiring changes to technical certificate premises in an apartment building.
In order to carry out reconstruction, you must come to the Department of Construction, State Expertise and Housing and Communal Services of the Kurgan Region with documents and submit a notification for reconstruction.
A response will be given within 7 days.
If the answer is yes, then reconstruction can be carried out using maternity capital funds.

5. In a two-apartment log house there is a cold veranda; in its place we want to build a boiler room of the same size. This will be reconstruction or redevelopment. I didn’t find anywhere that the apartment could be reconstructed. Own land and apartment too.

5.1. The concept of reconstruction refers to a specific building, redevelopment - to specific premises inside the building... In your case - reconstruction... Coordinate the arrangement of the boiler room with the administration and neighbors...

6. Owned land, owned house. Reconstruction of the house has begun. The veranda has been extended by a meter, old roof dismantled, the frame of a new roof was partially made. The fence is more than three meters away. No notice was given for reconstruction. The old house accordingly remained within its original boundaries, except for the veranda. Will the reconstruction be recognized in court?

6.1. Good afternoon Why don’t you contact the BTI or cadastral engineer to make a technical plan? And update the information with the documents in Rosreestr?

7. There is half a house in the property. The house has a veranda and the utility room is used as a closet. I want to demolish the veranda and outbuildings and build them in their place living room and a bathroom. Can I do this without notice of renovation. Without changing the building spot.

7.1. Without notification of the construction and reconstruction of the house, as well as the permission of the second owner, you cannot, since you have joint, common property Art. 247 Civil Code of the Russian Federation.

8. My grandfather has a brick private residential house; a veranda was originally attached to it (also brick - the only difference is the thickness of the masonry). Now he wants to turn the veranda and entryway into residential heated premises - a room and a second corridor. What is needed in order to legitimize the “reconstruction” (insulation work has already begun)? Where and what to go for? What documents should I provide to register the alteration?

8.1. Contact your local authority. You need to submit a notice of planned renovation of a residential building. Upon receiving the consent of the administration, carry out reconstruction. After its completion, you need to conclude an agreement for the implementation of cadastral work with a cadastral engineer. He will prepare a technical plan for the reconstructed residential building. Again, it is necessary to submit a notification to the administration about the completed reconstruction of the house. After receiving consent, you send all documents to the MFC with an application to make changes to the information about the capital construction project.

If you find it difficult to formulate a question, call the toll-free multi-line phone 8 800 505-91-11 , a lawyer will help you

A veranda in a private house is a covered terrace, which is often added to the house with your own hands. It is located along the main wall and is a room without heating, for a pleasant pastime in the summer season. You can often find modern terraces with glazing; you can stay in them in any weather. When making it with your own hands, it is necessary to respect the overall ensemble of a country house or country house, maintain a uniform style and use the same materials in construction.

IN country house It’s better to make a summer one from logs log-shaped terrace located next to the main building. The construction of a veranda in wooden log houses is often carried out together with the construction of the main house and its roof smoothly transitions into the roof of the extension, which has a wall adjacent to the house; a single roofing material is used. In this article we will go through step by step the main points of building two types of terraces: open or closed, with our own hands.

General provisions for constructing a veranda

Modern construction of country houses and country cottages at the design stage involves the construction of a veranda for the house. In order to save money, customers remove the process of constructing extensions in order to further complete it with their own hands. Let's consider the main points that you need to pay attention to from the generalized experience of building terraces yourself.

Parameters by which verandas differ:

  1. How is it located in relation to the house: corner construction, from the end or along the facade of the house.
  2. Degree of protection: open or closed (glazed) extension. You can use modern materials to make from closed veranda open, this is achieved by sliding doors.
  3. What type of construction is it made of: built-in - a common foundation with the house or attached - its own foundation.
  4. Construction shape: rectangle, semicircle, polygon.

Veranda project

We must not forget, when designing an extension to a house, that its purpose is to improve the performance of the main structure: make it spacious, add beauty, comfort. A closed terrace also has the function of improving the thermal performance of the house. For proper construction The design of the summer extension must comply with the rules that are indicated in the developed project.

What does the project consist of:

  • We determine where in the main house we will add a veranda. The main aspect is maintaining the aesthetic perception of the entire architecture own home together with the veranda. Important! Experts recommend setting up a veranda in regions with high summer temperature on the west or east side of the main house. It will be less exposed to direct sunlight.
  • It is necessary to indicate the location of the entrance to the terrace (veranda). The entrance from the outside and the entrance from the house are indicated. You can make a through passage through the veranda when the door to the house is opposite the entrance to the veranda; this method is not recommended, as there is a risk of drafts.
  • We select the type of doors and their installation location.
  • We determine the total size of the summer room located along the house. Length is often accepted equal to length the wall along which the veranda is built. The width is usually taken in the range from 3 meters to 7 meters, the main thing is to maintain the proportion. When choosing the dimensions of the veranda, we relate them to the overall dimensions of the house in order to maintain a single ensemble of the exterior of the building.

A good example of building a veranda with your own hands, when the design is done at the design stage of the entire house.

Let's go through step-by-step construction of a veranda in a wooden house with our own hands. It should be noted that an extension to the house can only begin after it has completely settled. Log houses, or made from timber, shrink actively over the course of three years; during this period it is better not to build an extension, otherwise the walls may warp. Experienced builders It is recommended for those who do not want to wait to build a transitional structure of the veranda with the house, which allows the frame to play.

How to start construction?

Home reconstruction should be reflected in permitting documents. To obtain these permits, you must contact the regional architecture department and submit the following documents:

  1. The right to own a plot of land (the land on which the house stands).
  2. Design documentation of the main structure.
  3. Written consent of all registered residents in the house for the reconstruction and addition of a veranda.
  4. Application from the developer for registration of an extension.

It is advisable to start drawing up documents for a construction permit 3-4 months before the start of work. From the general experience of private developers, this is a lengthy procedure.

You can build an extension without permits, but in this case problems may arise when the house becomes an inheritance or you want to sell it. The reason is the change in the total area of ​​the house, since the veranda is part of it, and the total area of ​​the residential building is taken into account with it. The BTI department may consider this as an unauthorized decision to increase the area for housing. This is especially true when the terrace is closed and heated.

There is no need to get carried away and make deviations in the dimensions of the terrace, which are indicated in the project. A simple check will easily reveal this, and a fine will follow with adjustments to the documentation. For what unauthorized developers can expect to add verandas to the house specified in the law of the Russian Federation.

Preparing for construction, choosing material

After determining the construction site of the veranda, it must be prepared. The construction site begins along the selected wall, so before starting all work you need to:

What tools and materials will we need?

When it's done wooden extension with your own hands, Tool you will need:

  • Having construction skills you need: a hacksaw, an ax.
  • Power tools: sledgehammer, hammer.
  • Marking: tape measure, plumb line, level, marking cord, corner.
  • For the foundation: shovel

If done metal carcass, in addition, a welding unit and a grinder with a disk for cutting metal are being prepared. This type of frame is considered the most economical for building an extension.

It will look better brick veranda or wooden. Important! Make sure that the materials of the extension and the main house match.

Wooden summer extension requires the following material:

  • Lumber: beams, logs, boards, slats.
  • Elements of wooden fasteners.
  • Mixtures performing protective functions for wood.
  • Construction material: crushed stone, concrete.
  • You will need drying oil and roofing felt.
  • Choosing the material for the roof of the veranda.
  • Window and door systems.

In design additional room, for summer holidays, using metal corners, instead wooden materials metal profile is used, compositions for metal processing.

Possible for better review make an extension (walls and roof) from polycarbonate, the panorama will be complete and clear. TO positive properties This material has excellent heat retention properties and can be used for walls and roofs.

Advice! Materials that will be used in construction and that require pre-treatment must undergo this process first before construction.

The first thing you need to do is determine the type of foundation for your veranda. A popular type is columnar foundation, since it is not tied to the foundation of capital construction (house). If the veranda is being built for a long time and thoroughly, it needs a strip foundation.

Before making a foundation, you need to refer to the house construction documents, which indicate what soil it stands on; you can choose from this type of foundation for an extension. Parameters to pay attention to:

  1. What is the soil's ability to absorb moisture?
  2. What is the composition of the soil at the site where the veranda is being built?
  3. To what depth does the soil freeze in the region where you live?
  4. How close to the surface is groundwater?
  5. General provisions for soil stability.

When choosing the type of foundation for a veranda, we pay attention to the foundation of the main building, its design, and what condition it is in load-bearing walls. After choosing the foundation, it is done marking on the soil for further work.

Advice! A small wooden veranda will sit quite well on a columnar foundation at the corners of the extension. For wide and long verandas, the installation of pillars is used at intervals of 600 millimeters along the length and width of the extension.

Columnar foundation, how to make it?

The foundation (foundation) for an extension is just as important as for the main house; it must be made from quality material. Work order:

  1. We dig holes for the pillars to a depth of at least 100 centimeters; its depth cannot be less than the depth of the foundation under the main building. The level of soil freezing is taken into account; the hole should be deeper than this level.
  2. At the bottom of the dug holes we make a cushion, this is a mixture of sand and crushed stone. The pillow can be made in layers, sand, crushed stone.
  3. Fill the pillow with concrete.
  4. We lay out support columns from brick when the main house is brick. If the main house is wooden, wooden beams are used as columns. Metal supports or asbestos pipes are used in columnar foundations for a frame veranda.

The veranda looks beautiful when it is on the 2nd floor level of the house. In this case, the ground part of the extension support is laid out at the level of the main foundation under the house. When a house with a high base is recommended, the veranda should be built according to its level.

Making a strip foundation

It is used if a heavy veranda with glazing is planned. To equip it, a trench is dug along the perimeter of the future veranda and formwork is installed. It is placed a little higher than it is planned to fill the foundation with concrete.

After pouring the foundation with concrete, it is periodically moistened with water until it is completely formed; this is necessary for uniform hardening of the foundation.

Making a veranda frame

For a wooden house, the veranda frame begins with laying timber on supports in bottom trim. In the corners we use a “dovetail” for cuts, it’s better this way join timber at corners. For reliability, nails are used; dowel fastening is possible.

Timber for a wooden veranda is used with a cross-section: 100x100 or 180x80 millimeters. When logs are used in the harness, their cross-section should not be larger than 120 millimeters. The supports near the wall are made higher than the rest to form pitched roof. When the frame is mounted, horizontally installed beams are the basis for the window sill, if glazing is provided. The top trim completes the installation of the veranda frame; it is the basis for the rafters and creates rigidity for the entire system.

Temporary spacers must be used to avoid distortion in the frame structure.

Veranda roof

Once they have decided on the material for covering the roof, they begin to install the sheathing on the rafters, which are attached to the top trim.

Structurally for verandas we offer the following types of roofing:

  • Single pitch roof. This simple design, is easy to do. Requires a slope from the main wall of the house towards the street.
  • Gable roof. It is used if the veranda is attached to the end of the house with a narrow side.
  • Polygonal roof. Its design is varied, the main thing is to maintain a slope for water drainage.

The rafter system is installed based on the selected material:

  • Lathing for metal tiles, slate and ondulin
  • Continuous flooring is made for flexible materials roofs.

Making the floor with your own hands is simple:

  1. We install the logs on the lower frame of the veranda structure. The distance between the lags is no more than 100 centimeters. We install them perpendicular to the floorboard.
  2. We cover the logs, checked by level with a floorboard.

If you plan to build open veranda, many agree on installing a floor with a slight slope to allow water to drain. The board is fastened with self-tapping screws, the length of which is twice the width of the board. It is necessary to impregnate the floorboards with a solution that resists the creation of fungal deposits.

Conclusion

Some finishing elements can be wooden veranda make carved. Great importance The arrangement of furniture on the terrace plays a role, this will create the interior and add coziness. Flowers and plants will enliven the room and give the feeling of an extension of the residential building.

The department operates on the territory of the exhibition complex of the Terem company in Kuzminki. We offer a wide range of services for the addition of new premises, completion and reconstruction of existing buildings. We work with each client individually, developing a project based on the wishes of the customer and the scope of the upcoming work.

If you have long wanted to update your home, renovate it or increase the area, contact the “Completion and Reconstruction” department of the Terem company.

The appearance of the house is just as important as the strength of its walls and the reliability of the roof. Modern buildings are distinguished by high-quality and aesthetic finishing of facades, which you can order in the “Additions and Reconstructions” department. We offer our clients various types of finishing materials from leading manufacturers, as well as professional work completed in the shortest possible time.

To update the appearance of your home, you can choose:

    fiber cement panels Nichiha (Japan);

    thermal panels with clinker tiles Stroeher (Germany) and Ceramika Paradyz (Poland);

    façade panels VinyPlus and VinyTherm (Germany);

    Nailite facade panels (USA);

    facade panels FineBer (Russia);

    vinyl siding VOX (Poland);

    vinyl siding Mitten (Canada);

    vinyl siding Encore (USA);

    vinyl siding Döcke (Germany - Russia);

    vinyl siding FineBer (Russia);

    false beams painted in the factory with Tikkurila paint (colors available);

    block house, false timber, lining.

The teams from the “Completion and Reconstruction” department will help you quickly and efficiently replace the roof or install a new one on an unfinished house. We offer you various options roofing materials, among which you are sure to find the right one:

    bitumen shingles Certain Teed (USA);

    bitumen shingles Shinglas (Russia);

    natural tiles Braas (Russia);

    metal tiles "Cascade" (Russia);

    metal tiles "Monterrey" (Russia);

    painted corrugated sheets (Russia);

    galvanized corrugated sheet (Russia).

if you have an old house, requiring reconstruction, an unfinished log house or you just want to update your dacha by summer season, please contact the “Completion and Reconstruction” department. We offer you a whole range of reconstruction services that will help make your country life more comfortable.

Our specialists are ready to perform:

    work on replacing or installing the finishing of the plinth;

    work on replacement or installation of exterior finishing;

    roof replacement or installation work;

    work on replacement or installation of drainage systems;

    work on replacing or installing windows, doors and interfloor stairs;

    installation of roller shutters;

    work on interior finishing of floors, walls, ceilings;

    works on insulation and sound insulation of buildings (Knauf, Rockwool, Isover);

    work to replace and strengthen structural elements;

    painting work;

    dismantling works.

You can make life in a country house even more pleasant by simply adding a comfortable porch, veranda or terrace. You can even attach winter Garden, barbecue area or full-fledged living room. Contact the “Additions and Reconstructions” department and find out how else you can increase the area of ​​the building.

Now there are special prices for the addition of verandas and terraces.

One of the most popular services of the “Additions and Reconstruction” department is the addition of attics. This way you can increase the area of ​​the house and acquire one or more additional rooms. IN attic rooms often furnish bedrooms for children, offices or guest bedrooms.

Now you can add a turnkey attic at a special price.

The Department of Construction and Reconstruction is launching a unique promotion especially for home owners from the Terem company!

Upgrade your country residence at a special price! Big discounts on finishing houses and bathhouses from Terem with siding, insulating buildings and, most importantly, constructing various outbuildings only valid for a week!

Moreover, if you order these services during the promotion period, until May 29 inclusive, our specialists will adjust the windows and drainage system in your home as a gift. As a result, you will actually carry out maintenance on your home and extend its service life.

To confirm the quality of work, we will increase the warranty on the renovated structure for three years. Thus, the guarantee for frame houses will reach 18 years, and for timber - 28!

For more information about the terms of the promotion, please visit or contact the managers of the “Completion and Reconstruction” department of the Terem company. We are waiting for you at the exhibition complex at the address: Moscow, st. Zelenodolskaya, vl. 42, from 10:00 to 20:00

The “Completion and Reconstruction” department of the Terem company works not only with existing buildings, but also designs and constructs new ones. If you want to acquire a small building based on an individual project, contact the department’s specialists.

Dismantling wooden buildings

Independent dismantling of wooden buildings can result in collapse, so you should not take risks and try to do this work on your own. When dismantling, Terem company specialists must comply with safety regulations and strictly follow the technologies for dismantling wooden objects.

    Dismantling the extension

    Attic dismantling

    Dismantling the partition

    Dismantling roofing

    Dismantling the cladding (internal or external)

Please note that dismantling is carried out without garbage removal.

Any object is disassembled to the ground. If construction is planned in the future, then after the garbage is removed there will be a clean area where construction work can immediately begin.

Construction of the foundation for the extension

If you decide to make an extension to your house, then the first thing you will encounter is the need to choose a foundation. The Terem company offers the opportunity to order one of the following types foundation:

You can order the dismantling of the following buildings:

    Pile-screw

    Block supports

    Monolithic reinforced tape

    Drilling with grillage

Our specialists will help you with your choice, provide free advice and answer all your questions.

Individual reconstruction of buildings

    Window replacement

    Service for dismantling old windows and installing new ones, selecting the type and type of windows at the request of the client. Wooden windows are inexpensive, environmentally friendly windows that require some maintenance. Installation possible wooden double glazing. Plastic windows are durable, strong, and easy to maintain. Important point– installation, which should be carried out by professionals with extensive experience.

    Replacing doors

    Replacement of interior and entrance doors. A popular option is varnish paneled with good sound insulation, a high degree of strength and reliability. When choosing entrance doors, a reliable and solid option would be metal doors, which will protect your home, will last for many years and will surprise you with its resistance to temperature changes, corrosion and fire. Our specialists will also deliver and install entrance and interior doors according to your individual order.

    Replacing stairs

    Replacement service wooden stairs. The service begins with the dismantling of the old staircase. The new staircase is brought to the site disassembled, all parts - steps, railings, balusters - are numbered. After assembling the stairs, the installation phase begins. The ladder is installed and securely fastened.

    Roof replacement

    Service for replacing the roof and/or roofing covering with a ventilation device for the under-roof space. Reconstruction of the entire roof, complete or partial replacement coatings, wise choice roofing material leading manufacturers. Construction of attic floors with the ability to choose the type of roof: pitched (single-pitched, gable, etc.), flat, broken.

    Replacement and strengthening of the structural part of the house

    Installation of new partitions, redevelopment of the premises, as well as installation of arches, installation of load-bearing beams. Experienced specialists will carry out all work to replace and strengthen the structural part of the house in the shortest possible time and using high-quality building materials.

    Installation of a drainage system

    Additional insulation of a country house is carried out with the aim of preserving heat in the house. Walls can be insulated with outside and inside the building. Most often used mineral wool famous brand KNAUF, in slabs or rolls.

    A professional team and specialist are assigned to work on each project for consultations and prompt resolution of issues that arise.

Completion of existing buildings

    Extension of a terrace, veranda or combined extension according to an individual project

    Extension of terraces and verandas according to standard or individual projects, taking into account the features of the main structure. This option for modernizing a house is the optimal solution for increasing the area of ​​the building and will help give the house uniqueness and architectural completeness. When developing a project, our specialists take into account the type and depth of the foundation, the condition of the walls and roof. Decorative finishing is carried out in accordance with the appearance of the main building.

    Construction of a full second floor

    A full second floor is a room whose area is equal to the area of ​​the first floor, and the ceiling is made without roof slopes. The company's specialists will construct the second floor taking into account all the rules and regulations and using modern materials.

    Construction of the attic floor

    The attic floor has a number of undeniable advantages. First of all, this is an additional effective area, which can be equipped, for example, as a bedroom, nursery or recreation room. The height of the attic walls to the beginning of the slope is no more than 1.5 meters.

    The attic floor can be of several configurations:

    • WITH gable roof

      With a broken roof

      One and a half floor

    Construction of a bay window extension

    The service allows you to increase the area of ​​the main building. Additional space is most often added to kitchens, dining rooms, living rooms and even bedrooms. Modern materials and technologies are used

    Interior decoration

    You can order the interior decoration of the building using the following materials: lining, false beams, blockhouse, plasterboard, OSB, plastic panels, floor board, laminate.

    Exterior finishing

    The service is performed using (at the client’s choice) the following modern materials: siding, lining, facade panels, clinker tiles, basement siding, decorative elements.

    Exterior painting

    Treatment and protection of external walls from external influence environment.

    Wooden finishing of baths

    Finishing all rooms, including the steam room.

4 steps to successful construction

    STEP I. Fill out the online application and make a preliminary call

    STEP II. Visit to the exhibition site. At the first meeting with department employees, it is advisable to bring information about your building: photographs, plan (by hand or BTI). The specialist will determine the feasibility of the work, timing and preliminary cost.

    STEP III. Departure of a measuring engineer based on the results of the first meeting for a detailed inspection and measurements of the object

    STEP IV. Drawing up technical specifications, design and calculations, concluding a contract

In this section we have collected real stories from our clients for you. The photographs will help you clearly imagine what the houses looked like before contacting the Terem company and what they looked like after completion and/or reconstruction. And in the description you will find information about the used finishing materials and stages of work being carried out. The section will be updated regularly interesting stories and illustrations.

From a small house to a mansion

The completion and reconstruction department of the Terem company deals with even the most complex and large-scale cases. This time the specialists had to work on a log house with two outbuildings made of timber for the Golikov family. The house was completely clad in siding, so no exterior finishing was required. But it was necessary to dismantle the roof and ceiling on two extensions and the roofing of the house.

After graduation preparatory work skilled builders began building up the walls of the extensions to the level of the first floor floors and adding a second floor above the existing extensions. But what was still ahead was the insulation of the elements of the entire structure: floors, walls, roof. The finishing touch was the replacement of the house's roof and porch, as well as interior finishing and installation of a drainage system. As specialists from the completion and reconstruction department explain, the work was really large-scale, but now the service life of the house has increased significantly.

During the work, only high-quality building materials were used: Cascade metal tiles, Encore siding, Nicoll drainage system, Knauf thermal insulation material.

when professionals work on a project

The team from the completion and reconstruction department of the Terem company had to do a huge job - turn an old house made of timber into a modern, warm and beautiful cottage.

The work began with the dismantling of the veranda and terrace. After this, the construction of a strip-monolithic foundation began, on which an insulated frame veranda with an attic and a terrace was then erected. In the house itself, all windows and doors were replaced, a staircase and a drainage system were installed. Professional builders also completed the exterior of the entire house. The department of completion and reconstruction explained that high-quality and proven materials were used for the work: Monterrey metal tiles, Knauf thermal insulation material, and the exterior finishing was done using a blockhouse.

The Terem company is engaged in the completion and reconstruction, without exaggeration, of all types of country houses. We can find our own approach to each object, including brick houses. This time, the company’s specialists took on the completion and reconstruction of the Ivanenko family’s house.

The roof covering of the veranda was dismantled and its walls were strengthened. Professional builders increased the height of the existing foundation for the extension using block pillars. After which a frame veranda was added open terrace and installation of stairs and fencing. The completion and reconstruction department of the Terem company explained that the outside of the veranda was lined with a blockhouse, the interior walls were also finished and windows were installed in the shortest possible time, and the builders laid the roof with galvanized corrugated sheets.



Specialists from the completion and reconstruction department were faced with the task of building a new attic floor and replacing the roof of the garage. I had to work with brick house modern construction.

Work began with dismantling the attic to the floor slabs. After which the builders began constructing an attic floor insulated with Knauf thermal insulation material and replacing the garage roof with soft roof ST-20 Cedar Brown.

A blockhouse was used for interior decoration of the entire attic space. We also installed skylights and sheathed the gables. facade panels, - said in the completion and reconstruction department. The builders also installed snow cutters and a Nicoll drainage system at the customer’s house.

The Novikov family turned to the Terem company in the hope of giving new life to their house with a log veranda. The completion and reconstruction department took up the work.

We had a lot of work ahead of us. It was necessary to dismantle the old roofing and then replace it with a new one. We also needed to install new windows, doors, stairs, and a drainage system,” says a technologist from the completion and reconstruction department.

The builders and specialists of the department coped with the tasks set by the customer with a bang and completed it all in the shortest possible time.

But the most large-scale part of the entire reconstruction was the addition of an insulated veranda with a one-and-a-half floor and an open terrace. Before starting work, professional builders installed a strip, monolithic-reinforced foundation for the extension.

An important point is the materials that we used in the process. The Terem company uses the services of only trusted suppliers and uses exclusively high-quality materials, explained the completion and reconstruction department.

Therefore, Encore siding was used for exterior finishing, and “Cascade” metal tiles became the roofing material. thermal insulation material Knauf products were used, and the drainage system was from TechnoNikol.

The Novikov family was satisfied, and in the completion and reconstruction department of the Terem company they say that this way even the oldest building can be given a new life. The main thing is to contact a trusted company.

Specialists from the completion and reconstruction department of the Terem company took



 
Articles By topic:
How and how long to bake beef
Baking meat in the oven is popular among housewives. If all the rules are followed, the finished dish is served hot and cold, and slices are made for sandwiches. Beef in the oven will become a dish of the day if you pay attention to preparing the meat for baking. If you don't take into account
Why do the testicles itch and what can you do to get rid of the discomfort?
Many men are interested in why their balls begin to itch and how to eliminate this cause. Some believe that this is due to uncomfortable underwear, while others think that it is due to irregular hygiene. One way or another, this problem needs to be solved.
Why do eggs itch?
Minced meat for beef and pork cutlets: recipe with photos
Until recently, I prepared cutlets only from homemade minced meat.  But just the other day I tried to cook them from a piece of beef tenderloin, and to be honest, I really liked them and my whole family liked them.  In order to get cutlets
Schemes for launching spacecraft Orbits of artificial Earth satellites