Projects of two-story houses made of gas silicate blocks and turnkey construction services. Projects of two-story houses made of aerated concrete Beautiful facade of a 2-story house made of aerated concrete

Drafting a private country house, many pay special attention to the choice of the main building material for the construction of walls. Often this choice falls on environmentally friendly, safe, modern and inexpensive materials. Many development companies build cottages from aerated concrete or a similar material. Aerated concrete has significant advantages in price and ease of use over stone, brick or cement, but is significantly inferior to them in strength. In order to build a two-story building from such a material without risk, it is necessary to take into account the characteristics of aerated concrete when creating the project and know some of the subtleties to ensure the strength of the structure.

Advantages and disadvantages of aerated concrete

The increased popularity of gas blocks is largely based solely on advertising from manufacturers, who sometimes exaggerate many times over specifications this material, which ultimately leads to a violation of the strength of the structure. During the use of this material in construction, many experts have empirically determined real benefits and shortcomings of the material, and also developed some important rules construction. The advantages of the material include:

  • Heat saving. For middle climatic latitudes, the walls of the house do not even need to be insulated, since aerated concrete itself has low thermal conductivity due to its porous structure.
  • Ease of processing and speed of construction. Cottages made of aerated concrete are built quite quickly, since the blocks can be easily cut with a regular hand saw and quickly adjusted to fit required sizes. The material has large sizes, almost ideal geometry and very light.
  • High sound insulation. Porous material significantly dampens noise and, paired with a good double-glazed window, will provide excellent sound insulation from the inside and outside.
  • Low cost and environmentally friendly material.
  • Vapor permeability. Aerated concrete blocks“dishat”, which prevents the formation of condensation and dampness.

A unique feature is the ability to use a thin layer of mortar for installation. Many experts consider this material a worthy alternative natural wood.

Important. When building a two-story cottage from aerated concrete, you need to remember that aerated blocks have high compressive strength, but very low fracture strength. In this regard, for two storey building It is recommended to use monolithic or strip foundation high strength. If it is planned to build a second floor in the house, then the walls of the first floor must be reinforced with steel rods, as shown in the photo above.

The disadvantages of aerated concrete include the following qualities:

  • Moisture absorption. The unprotected surface of the block is a sponge that strongly absorbs moisture and, as a result, the strength of the module is lost, as well as its thermal insulation and breathability qualities. It is for this reason that the surface of the blocks must be protected with plaster or moisture-resistant paint.
  • The problem of plastering. This drawback follows from the first. Since the blocks quickly absorb moisture, it is not possible to apply high-quality plaster. For this purpose, special primers are used and plaster mixtures on a polymer basis with pre-laying grids
  • Cracks. When the slightest voltage appears, especially in places where door and window openings

, cracks often appear and blocks are destroyed due to the fragility of the material. The solution in such situations is to pre-install a metal frame in the openings, which takes on the entire load, as shown in the photo below. Important. When transporting aerated concrete, it is necessary to take into account its fragility and transport it in packs on separate trays. It is also necessary to ensure that the material is stored in a dry place. When stored at outdoors

, the material can absorb moisture, as a result of which residual lime becomes wet, which, after drying, contributes to rapid destruction from corrosion.

Differences between aerated concrete and foam concrete

When building houses from aerated concrete blocks with their own hands, many often use foam concrete by mistake. Sometimes even product distributors themselves deliberately substitute materials for the purpose of personal profit from the ignorance of customers. In fact, these are very similar materials to each other, but they differ greatly in their manufacturing method and scope of application. For example, foam concrete is used exclusively for the construction of internal partitions of a house and cannot be used for load-bearing walls due to its high fragility. These two materials can be distinguished by quality outer surface

  • block. Foam concrete is made by pouring f special shapes, as a result of which its surface is smooth and the pores are practically invisible. The material holds plaster very poorly; it is usually treated with a special putty or covered with plasterboard. Before puttying, the foam concrete is covered with soil and a reinforcing mesh is applied.
  • Aerated concrete can be distinguished by its porous surface, since it is cut to size with special strings or saws from a pre-prepared slab. Plaster and putty adhere to such material much better, but for greater reliability, laying reinforcing mesh is also recommended.

Construction of houses from aerated concrete

When building a house or cottage from aerated concrete, special attention must be paid to the density of the material, which is indicated in the markings by the English letter “D” and the range can be from 350 to 800 kilograms per cubic meter.

Important. For one-story house Usually, blocks with a density of D400 or D500 are chosen depending on the massiveness of the roof. For a two-story cottage, more durable blocks of the D600 or D800 brands are laid on the first floor, and less durable D 400 is used for the second floor.

During two-story construction, in addition to internal reinforcement with steel rods as shown in the photo above, specialists use additional reinforcement from steel mesh, which is laid every 2 rows of masonry, as shown in the photo below. This provides additional strength to the walls.

Important. Select block density in accordance with the climate zone. The higher the density of the material, the higher its ability to retain heat and therefore the cost increases. It is necessary to carefully calculate the required block density and wall thickness for your climatic region, taking into account the average summer and winter temperature. It is possible that using aerated concrete can be significantly more expensive than using conventional brick.

For interfloor ceilings you can use conventional reinforced concrete slabs, but the top row of blocks needs to be reinforced with additional reinforcement, as shown in the photo above. However, to reduce pressure on load-bearing walls, experts recommend using wooden beams.

Basic requirements for aerated concrete construction

When building houses from aerated concrete, several basic rules must be taken into account:

  • As a foundation, it is necessary to use a strip or slab foundation of a monolithic type, with height differences on one square meter surfaces should not exceed 10 mm.
  • The first row of masonry is fixed on a cement-lime mortar, the subsequent ones are laid on a special adhesive for aerated concrete, strictly observing the thickness of the mortar.
  • If there are tongue-and-groove joints on the blocks, the vertical seams must also be coated with glue.

Important. Creating two-storey house made of aerated concrete, the walls of the first floor must be reinforced with metal rods with a thickness of 8-10 mm, as shown in the photo above. The first and every third row is subject to reinforcement.

If there are window openings, the rows must be reinforced in such a way that the bottom and top rows window opening had reinforcement.

  • Be sure to lay volumetric reinforcement on the last top row before installing the floor. To do this, it is recommended to use special U-shaped blocks or cut out a cavity for the reinforcement yourself.

It is important to remember that complete shrinkage of aerated concrete requires an average of 2-3 years, with the degree of shrinkage averaging 2 mm per meter of wall.

Houses made of aerated concrete usually do not need insulation, but the surface of the material must be protected from exposure to atmospheric moisture. It is strictly not recommended to insulate a building with foam plastic or similar materials, since they do not allow air to pass through and condensation will form on the walls.

To plaster or putty the walls of a building, use special plastic compounds, having previously installed reinforced mesh silt metal or propylene.

A two-story gas silicate house will be the ideal embodiment of a personal fortress and a cozy family nest. The practical and automated technology for constructing such housing allows the work to be completed in the shortest possible time.

Advantages of houses made of gas silicate from the Dachny Season company

  1. Since this material weighs several times less than concrete, to complete the construction you will not need to overpay for the rental of a large construction equipment. Low weight also simplifies the process of laying the foundation and choosing a site.
  2. The cost of a finished project for a two-story house made of gas silicate blocks on a turnkey basis will be much lower than that of a similar building made of brick. At the same time, the material copes with the task perfectly, having a full set of characteristics to ensure a comfortable life.
  3. The block structure with pores has excellent heat-saving properties. In the winter season you will not have to overpay for gas meter to keep your home at a minimum level of heat.
  4. You can see prices and photos of the most popular two-story gas silicate houses on our website. Any design variations are not final. If desired, our craftsmen can change the layout interior spaces by adding the quantity living rooms or an additional bathroom.
  5. Projects two-story houses made of gas silicate are completely invulnerable to any corrosive processes, mold and rot. They also do not suffer from insects or rodents. Modern material solves at once the most annoying problems that owners of private houses inevitably faced in the last century.
  6. Testing revealed a high level of fire resistance of the material. It can successfully resist fire for three hours.

Lightweight gas-block structures allow you to build inexpensive two-story houses, very popular in suburban construction. The Domamo catalog offers a choice of ready-made projects of modern two-story houses made of aerated concrete with the possibility individual design and turnkey contracts.

Features of two-story buildings made of aerated blocks

Aerated concrete is a unique material that has the strength and wear resistance of brick, the highest thermal efficiency and relatively low weight. Thanks to this set of properties, buildings made from it have almost universal use- become reliable housing for year-round living, country houses or economic areas.

Cottages made of aerated concrete blocks, built on 2 floors, combine:

  • Possibility of placement in small areas with a large internal area. The project of such a house may include many functional premises with convenient zoning of space.
  • The sufficiency of a not too powerful foundation, for example, the choice of a simplified strip scheme.
  • Complementing the building with such necessary elements outside the city as own bathhouse and a garage.
  • Wide architectural and finishing possibilities,
  • Speed ​​of construction and low cost of finishing work.

Projects for country houses made of aerated concrete can be made on 2 full floors or with an attic, which will be slightly smaller in area, but will provide even greater energy efficiency of the entire house. Expansion of the area can also be carried out through basement rooms and external terraces.

On the website you will find options for aerated concrete houses various sizes, internal layout and finishing. The search can be carried out both using an advanced filter and using photos of exemplary works.

Built country house using frame technology plus small veranda. The cost turned out to be quite economical, and the time frame was 3 and a half months. We even finished it a couple of weeks earlier than promised. We only go to the dacha in the summer, so I can’t say anything about thermal insulation. Thank you

Thank you very much for building a house made of aerated concrete. The quality of both the material and work is excellent - FRIENDS WILL BE JEALOUS. The time frame for completed work is approximately 4.5 months. empty space the house was built. Good luck to all of you, good clients and big houses!!


They built our house in 3 months (they started the foundation at the end of summer, and finished the walls and interior decoration in the fall), it wasn’t cheap, but everything was thought out, our participation was minimal. This year we are building a bathhouse together with them! Thank you for such professional guys that you provided us with!


Thank you so much for your work and attitude! Everything is efficient, high quality, fast! Thanks to the team led by Alexey!


The company built me ​​a great one summer house! I don’t have any complaints about the company; next summer I’m going to build a bathhouse and a garage. I’ll definitely contact them. Thanks to everyone, especially Sergei’s team, who built it for me, a lot depends on them!


We built a house from aerated concrete in your company - I’m very pleased. The house was erected on our pre-prepared foundation in 45 days. And as a gift we received home insurance for a year. So I recommend it.


In August 2017 I ordered the foundation ( monolithic slab) for a house in the Leningrad region. In 2018 I already ordered the house itself. I can recommend it because... We were pleased with the result. Everything was done quickly and professionally.


We ordered a house and garage from this company in the summer of 2016. The builders worked for about 4 months, without a break (they really liked it). Everything was done according to the agreement, no extra money was asked.


Frequently asked questions before construction

About company

How long has your company been in business?

Our company began work as a repair and finishing company in 2007. From that moment on, we have grown into the construction industry and all thanks to our employees. Special thanks for the work invested in the development of the company.

How is the competence of specialists confirmed?

All architects and engineers of the company have qualification certificates. Because the project is not subject to a company license, but to an architect’s certificate. By law, responsibility for the project lies with the architect.

Does your company do all the work? Or do you use contractors?

  • We ourselves carry out general construction, Finishing work, site arrangement, wiring engineering systems(electricity, heating around the house, water supply) and so on.
  • We invite contractors to work that we do not perform every day and require specialization, for example: production and installation of windows and doors (special orders), air conditioning systems, boiler room equipment, installation of wells, septic tanks.
  • Searching, attracting, complying with agreements and monitoring the performance of work by contractors is our task.
  • We carry out 80% of all work on the construction of your home ourselves and only 20% involve contractors.
  • We enter into an agreement with each contractor in which he specifies a guarantee for the work performed by him, and in case of malfunctions, their elimination is the responsibility of the contractor.

Is it possible to see objects that are currently in operation?

Yes, there are objects that we can show at different stages works and already completed houses by prior arrangement.

about the project

Should I buy a standard project or order an individual one?

Buy a ready-made project.

  • Plus is the price.
  • The downside is that it will not include all your wishes regarding materials and layouts. Also, it will require modification to suit the characteristics of your site.

Buy a ready-made project and modify it.

It all depends on the changes you want to make. A possible option is to develop individual project It will be more profitable for you than modifying the standard one.

The cost of such modifications must be discussed during the meeting.

Development of an individual house project.

  • Pros: all your wishes regarding all characteristics of the house and site are taken into account.
  • The downside is that the cost of such a project is higher than a standard one.

BUT! You can develop an individual project for free. If our company builds, then the development of an individual project is free for you.

How is an individual project developed?

  • The development of an individual project begins with the signing of a contract and the first meeting with the architects, at which the client voices his wishes. Based on the results of the meeting, a design assignment is drawn up, which is an annex to the contract.
  • Architects prepare several versions of sketches and decide with the client in which direction to move next. During the entire design period, several meetings take place with the client, at which all architectural and design solutions are worked out in detail until the client is satisfied with everything, which he confirms with a signature on the Draft Design.
  • Next, a working draft is developed. This is the calculation phase of each design solution in which the client is not involved.
  • This entire process takes from 2 weeks to 2 months, after which the client receives a finished project with ready-made detailed calculations, which is necessary when submitting documents for a building permit.

About construction

Will you go to the site where construction is planned?

Yes. When inspecting the site, we take into account the size, access from the road and its width, the proximity of neighboring buildings, the presence of a slope or drop, cardinal directions and what kind of soil is on the site.

Do you help with choosing a site for construction?

Yes. Our specialists help with site selection. They will help you find it according to your requirements on the Internet with advertisements.

What affects the final price of a home?

The cost of building a house is affected by:

  • site features: relief, entry conditions, location
  • materials used in construction
  • house architecture features
  • work conditions (working time restrictions)

What guarantees do you provide?

We provide a 3-year guarantee on our work. The manufacturer provides a guarantee for materials and it is different in each case. There are materials for which the manufacturer provides a lifetime warranty.

How can I control construction?

  • We send each client step by step photo work report.
  • We install online video surveillance of the facility 24 hours a day, you and the company’s specialists have access to it (paid service).
  • You can also use the services of companies that provide technical control.
  • The construction is carried out in stages, you always see which stage and only after accepting one, we proceed to the next.

When is the contract signed?

  • The design contract is signed at the meeting, before the first communication with the architect.
  • The construction contract is signed after the estimate has been developed and approved.

When should I pay for your work?

For design, an advance payment is required within 5 days after signing the contract in the amount of 70% of the total amount. The balance is paid upon delivery of the finished project to the client.

Payment for construction is broken down according to the stages specified in the estimate. Each stage of construction is also divided into payments, the size of which may vary (usually due to the need to purchase materials)

How are builders placed?

  1. It will be convenient if you have the opportunity to place builders near the construction site, it will be suitable garden house, construction trailer, an old house or any other building with a roof.
  2. If there is nothing like that, then we are ready to bring our change house for FREE.
  3. In extreme cases, we will accommodate our builders in a nearby hostel

What communications are needed to start construction: electricity, water?

Electricity with a power of at least 5 kW and technical water.

If this is not the case, then we will bring our generators FREE OF CHARGE. In most cases, water wood construction used only for household needs, we will provide its delivery on our own.

What time of year do you carry out construction?

We are building all year round, one of important conditions in the spring-autumn period this is a suitable road for vehicle access.

WHAT CAN WE DO FOR YOU?

We will help you save by correctly calculating the estimate and choosing high-quality materials.

Complete high-quality design documentation, thanks to which you can not worry about the accepted Constructive decisions.

We work throughout the Moscow region

Volokolamsk district, Voskresensky district, Dmitrovsky district, Yegoryevsky district, Zaraisky district, Istra district, Kashirsky district, Klinsky district, Kolomna district, Krasnogorsky district, Leninsky district, Lotoshinsky district, Lukhovitsky district, Lyuberetsky district, Mozhaisky district, Mytishchi district , Naro-Fominsk district, Noginsk district, Odintsovo district, Ozersky district, Orekhovo-Zuevsky district, Pavlovo-Posadsky district, Podolsky district, Pushkinsky district, Ramensky district, Ruza district, Sergiev Posad district, Serebryano-Prudsky district, Serpukhov district, Solnechnogorsk district, Stupinsky district, Taldomsky district, Chekhov district, Shatursky district, Shakhovsky district, Shchelkovsky district.

    What was done

    Project: the Innsbruck project was adapted to the site and the wishes of the Customer's family, and a solution was proposed to move the terrace.
    foundation: based on geology and the architect’s calculations, the house was built on a pile-grill foundation.
    ceilings: basement - reinforced concrete monolithic; interfloor - reinforced concrete floor slabs.
    box: walls made of aerated concrete blocks, masonry with masonry glue. Windows are made to order, with one-sided lamination, installation on site.
    roof: metal tiles.
    exterior decoration: the walls are insulated with basalt facade insulation and plastered, the finishing elements are made of wood, manufactured locally, based on technical specifications visualization, painted. The base is laid out decorative stone.
    interior finishing: finishing was carried out according to the design project, where the combination was taken as the basis decorative plaster with stone and wood. False beams were installed on the ceilings.
    additionally: a fireplace has been installed and finished.

    What was done

    This is the very case when our Customer and we speak the same language and are inspired by the ECO high-tech style! Designer Ilya came to us with already finished Project your future home! Our team liked the project - after all, such unusual and stylish solutions are always a professional challenge!
    We prepared estimates for Ilya and developed unique design solutions - all this allowed us to implement this project! Frame house made in our proven Canadian technology with 200 mm insulation along the entire contour! The outside of the house is sheathed with imitation timber. All windows are made according to individual order and laminated in colors according to the project. Additional accents are placed thanks to professional painting of imitation timber and selection of paints.

    What was done

    What does it cost us to build a house? Indeed, having a team of professionals and knowledge, building a house from scratch is a matter of time! But sometimes the task is more difficult! We have introductory ones - an existing foundation, or buildings on the site, extensions to existing buildings and much more! For the Matsuev family it was exactly this not an easy task. They had a foundation from an old burnt house, and a landscaped area around it! The new house had to be built in a short time on the existing foundation. Dmitry and his family had a desire to build new house in high-tech style. After careful measurements, a design was made that took into account the old layout, but had a new one modern form with interesting innovations! appeared at home entry group, where you can sit at a table on cozy evenings and a complex but possible exploitable roof in our area. To implement such a roof, we called upon our knowledge and modern building materials, LVL beams, fused roofing and much more. Now in the summer you can have an unusual dinner on such a roof or watch the stars at night! In the decoration, our architect also emphasized the minimalistic and graphic high-tech style. Smooth plastered walls with painted plank details, and wooden beams at the entrance added personality. The inside of the house is finished with imitation timber, which is painted in different colors depending on the purpose of the room! Large windows in the living room kitchen overlooking the site created the desired effect of illumination and airiness of the space! The house of the Matsuev family - decorated our photo gallery in the section country architecture in high-tech style, the style chosen by brave Customers with excellent taste.

    What was done

    Olga and her family have long dreamed of a country house! A reliable, solid home for living that will fit perfectly into their difficult narrow plot! With the advent of children, it was decided to make the dream come true; children grow quickly and in own home There are many opportunities in nature and Fresh air. We, in turn, were glad to work on an individual house project in classic style made of red brick with a bay window! After the first acquaintance with our company in a cozy office, we invited Olga to take a look at our current construction site: evaluate the order and construction processes, storage of materials on site, get acquainted with the construction team, make sure the quality of the work. After visiting the site, Olga decided to work with us! And we were glad to do our favorite job again to make another country dream come true!

    What was done

    Project: changes were made to the San Rafael project and redevelopment was made according to the wishes of the Customer.
    floors: basement - reinforced concrete floor slabs; interfloor - reinforced concrete floor slabs
    box: walls made of expanded clay concrete blocks, masonry with mortar??? Windows have been installed.
    roof: metal tiles
    terrace: rough fencing elements have been completed, flooring has been installed.

    What was done

    Dmitry contacted our company with an interesting preliminary design to calculate the cost. Our experience allows us to perform such calculations based on preliminary designs with minimal errors, no more than 2%. Having visited our construction sites and received the cost of construction, Dmitry chose us from many of our colleagues in the workshop to complete the project. Our team began to carry out a difficult and expressive country project with spacious premises and garage, large windows and complex architecture. After the project was completed, Dmitry chose us as a contractor company, and we, in turn, wanted to do further work on the same high level! Since the object is large, Dmitry proposed stage-by-stage cooperation, namely, upon successful completion of the foundation work, we began the second part of the project - walls + floors + roofing. Also important for Dmitry exact dates construction, in order to speed up the construction processes, the team was reinforced by 2 experienced masons.
    The box on a pile-grillage foundation was delivered right on time! The result pleased us and the Customer. All stages of the work were coordinated and worked out for Dmitry and his individual project, which benefited all participants in the process!

    What was done

    Project: The project of our company Inkerman was changed taking into account the wishes of the Customer’s family, the house was planted on the site, taking into account the existing situation on the site and the relief
    foundation: based on geology and the architect’s calculations, the house was built on a reinforced pile-grillage foundation.
    ceilings: wooden wooden beams, in places large spans installation of LVL beams. Basement ceiling insulated basalt insulation in 200mm; interfloor ceiling with 150mm sound insulation.
    box: box: walls made of expanded clay concrete blocks, masonry with mortar. Windows have been installed.
    roofing: installation of metal tiles.
    external finishing: the facade is insulated with basalt facade slabs 100 mm, fronts closed facing bricks; color scheme proposed by the architect and agreed with the Customer.

    What was done

    The Krutov family decided to build a spacious house for the whole family to live in!
    Olga and other family members went from idea to implementation in several stages! Choice of technology long work on the project, building a foundation, building a house with exterior finishing and then working on interior decoration! Frame technology was chosen as energy-saving, prefabricated and high-tech! Why did the Krutovs choose our company? They were pleased with the quality of work on our construction site and the workers who gave us a detailed tour! We also worked on the estimate for a long time, combining different variants finishes, comparing their costs. This allowed me to choose best option from a wide variety finishing materials and complete sets.
    The project was created by an architect friend, but we had to work out the constructive part of it. After which the most reliable and effective foundation was erected - USHP. Next, work began on the box. Frame house with 200 mm insulation along the entire contour and unique technology roof insulation 300 mm. For the exterior decoration, siding was chosen in a spectacular combination of colors - coffee and cream. Accents are placed thanks to powerful roof overhangs, an interfloor belt and large windows!

    What was done

    When you decide to become the proud owner own home and move to a new home for permanent residence, first of all, you think about what the house will be like; what to build it from; how much will it cost and most importantly, WHO will do all this?
    Alexander, came to our company with the desire to move to his own Vacation home. He liked the Avignon project and there was already a strip foundation on the site. After the initial visit to the site, measurements and inspection of the foundation, we gave our conclusions and recommendations. Strengthen the foundation, change the project and adapt it to the size of the existing foundation! After agreeing on the cost, it was decided to build in winter. Alexander received reinforced concrete floors as a gift, one of the leading construction crews and a house according to the design you liked, standing on a plot with exterior finishing by spring! Alexander observed every stage of construction, regularly visiting the construction site and was pleased with the result, and we were pleased with our work. This is an individually designed Avignon project, implemented in stone technology with external insulation and siding finishing!

    What was done

    Each house is a separate story of creation and implementation! One day we built a house for good people and they recommended us to someone else to a good person! Rumyantsev Andrey came to our company with a desire to replace the old country house to build a one-story spacious country house with a fireplace for warm family evenings... It was decided to build the house from aerated concrete blocks so that the future country handsome man would delight the owner for decades! The customer voiced his wishes for finishing - and we, in turn, brought everything to life. Thanks to detailed visualization of the project, each element of the exterior decoration is a member of a friendly ensemble! Bavarian masonry, as the final stage of exterior decoration, looks noble and thorough. Without a doubt, such a tandem - aerated concrete and brick can be safely called the best solution in the field of stone house construction - warm, affordable, beautiful, reliable. Modern technologies have stepped forward so much that such unique configurations become available in a short time, because we built this project in winter months. The main thing is to have the necessary knowledge and constantly replenish it!

    What was done

    Project: the project of a European company was taken as a basis and was adapted to the site and the wishes of the Customer’s family; a terrace and patio were proposed, taking into account the cardinal directions on the Customer’s site.
    foundation: based on geology and the architect’s calculations, the house was built on a pile-grill foundation.
    ceilings: basement - reinforced concrete monolithic; interfloor - wooden on beams with a 150 mm sound insulation device.
    box: walls made of aerated concrete blocks, masonry with masonry glue. Windows are made to order with one-sided lamination, installation on site.
    roof: metal tiles.
    Exterior finishing: the walls are insulated with basalt facade insulation and plastered. Based on visualizations added façade panels under the Tolento stone. The enclosing elements of the terrace and balcony are made of wood, made locally, based on technical specifications visualization, and painted. The roof overhangs are lined with soffits matching the color of the roof.

    Vladimir Murashkin,

    Owner of a house “individual 8x9m”

    House parameters:

    What was done

    When Customers come to us with bright, modern ideas future home, we light up doubly! After all, work on a new stylish project it’s always interesting and a challenge, how to implement everything bold ideas from a constructive point of view, what materials should be used? Vladimir bought a plot of land with picturesque views of the Oka bank! This view could not be ignored, so an indispensable attribute of the future house was a dizzying terrace (51.1 m2) and large balcony oriented to beauty! Vladimir wanted to relax in nature precisely in wooden house, and it was necessary to build a house in a short time and the ideal solution for such problems was frame technology construction! If we’re going to be different, it’s in everything! The house was made even more spectacular by the vertical finishing of imitation timber made of durable larch, painted in natural shades with emphasized wood texture. Laminated windows complement the modern look of the house! It turned out to be an excellent country house, with highlights and at the same time incredibly functional.



 
Articles By topic:
How and how long to bake beef
Baking meat in the oven is popular among housewives. If all the rules are followed, the finished dish is served hot and cold, and slices are made for sandwiches. Beef in the oven will become the dish of the day if you pay attention to preparing the meat for baking. If you don't take into account
Why do the testicles itch and what to do to get rid of the discomfort?
Many men are interested in why their balls begin to itch and how to eliminate this cause. Some believe that this is due to uncomfortable underwear, while others think that it is due to irregular hygiene. One way or another, this problem needs to be solved.
Why do eggs itch?
Minced meat for beef and pork cutlets: recipe with photo
Until recently, I prepared cutlets only from homemade minced meat.  But just the other day I tried to cook them from a piece of beef tenderloin, and to be honest, I really liked them and my whole family liked them.  In order to get cutlets
1 2 3 Ptuf 53 · 10-09-2014 The union is certainly good. but the cost of removing 1 kg of cargo is still prohibitive. Previously, we discussed methods of delivering people into orbit, but I would like to discuss alternative methods of delivering cargo to rockets (agree with