Construction of a house from aerated concrete. How much does it cost to build a house made of aerated concrete, price Two-story house made of aerated concrete block 11 by 10

Small cottage It is good because it allows you to significantly save on building a foundation, the price of which, as is known, is about 30% of the cost of building an entire house. Compact house often has one floor, which means you don’t have to go up and down dozens of times a day. Such 10 by 10 house projects are especially relevant for families with small children or elderly relatives.

A small building provides a lot of options for decorating your home in the style you like. You can choose among hundreds of layouts - from classic to the most original. However, it is important to remember here that 10 by 10 house designs have usable area less than 100 sq. m. After all, part of it will be occupied by walls, storage rooms, closets. Enlarge slightly useful territory the attic, bay windows, balconies and other architectural nuances will help.

How to choose the optimal home layout

Certain requirements apply to the design of a house. For example, inner space should be divided into day and night zones. On the ground floor there is usually a day area - an entrance hall, a kitchen, a dining room, a living room. Sometimes it is added to them a guest room or office. On the second floor, 10 by 10 house designs usually provide two or three bedrooms and a dressing room. With this layout, there are usually two bathrooms - one on each floor. There is only one riser, that is, the bathrooms are located under each other, and the kitchen is located across the wall from the lower one. Another important nuance– the boiler room should be located as close to the kitchen as possible. Then you will need gas pipe shorter length.

It is worth noting that choosing a suitable project is a very responsible task. After all, later changing something will no longer be possible or will cost a lot of effort and money. In addition, it is very important to immediately decide on the construction material, since 10 by 10 house designs involve the use of almost any materials, from wood and brick to frame technologies.

Aerated concrete has a cellular structure. To produce it, a mixture of lime, cement, quartz sand and water. As a result of the reaction between aluminum powder and lime, hydrogen is formed. This, in turn, creates bubbles that occupy 85% of the block and provide low weight and high strength to the material.

By contacting the SVOD-STROY company, you can order the construction of a house from Aerostone and Bonolit autoclave aerated concrete blocks. They are distinguished by precise geometry and maximum strength. Such cellular blocks They do not require the use of carbide-tipped tools during construction and finishing and are easy to process, drill, saw, etc.

Turnkey aerated block houses are easy to assemble and are identical in comfort to brick cottages. They are convenient for year-round residence in the Moscow region. Their main advantages are the ability to implement complex projects, affordable cost and reliability.

Differences between aerated concrete and foam concrete

Foam concrete is made from concrete mixture, diluted with special additives. This mixture can be prepared directly on construction site without any certificate.

In contrast, aerated concrete is manufactured in factories. First, as a result of a chemical reaction, a mixture is formed, which is strengthened using an autoclave and cut with special strings. At the SVOD-STROY company, the construction of aerated concrete houses is carried out strictly from materials manufactured in accordance with GOST requirements.

Advantages of cottages made of aerated concrete blocks

A house made of aerated concrete blocks needs external insulation and shrinkage within 3-6 months. After this, it can be processed in any way and can be absolutely comfortable for year-round use. Block houses They belong to the middle price segment, but in terms of comfort and durability they are not much inferior to brick structures.

The undeniable advantages of this structure are:

  • profitability - the affordable cost of aerated concrete and its lightness, allowing the use of simple foundations, reduce total price finished house from blocks and costs for builders' services;
  • reliability - strong and durable blocks, subject to compliance construction technologies will serve more than one generation of residents;
  • moisture resistance and frost resistance - these characteristics allow you to live in such a house at any time of the year;
  • speed of construction - ease of processing determines the speed of installation.

House projects

The SVOD-STROY company provides turnkey construction services for houses made of aerated concrete blocks according to standard and individual projects. Since 1997, we have been conducting professional construction of private real estate in Moscow and the Moscow region. We offer the most reasonable prices for materials, labor and architects.



Our catalog contains more than 120 original projects with an area from 65 to 520 m2. Any of them can be modified in accordance with individual wishes. Our specialists in Moscow will advise on projects and prices for houses made of aerated blocks, and will also provide guidance on the timing and work plan.

Aerated concrete is widely in demand modern material. Dachas for temporary residence and durable capital houses. In any case, the use of this material allows you to implement practical and profitable projects.

We are talking about a building product in the form of blocks, shaped like bricks. They are easily identified by their white color and rough surface. The structure of aerated concrete is porous. The main components of the material are cement and sand. Aluminum powder is used to produce air cells. Lime is also involved in the reaction that results in the formation of pores. The highest quality is a product that has been in an autoclave and treated with steam under pressure.

Which aerated concrete to choose for building a house

Products can be used for the construction of the same building different brands. The walls are laid from denser blocks M500-M600. It is advisable to install partitions that do not bear such a large load from fragments marked M300-M400. The thickness of such “bricks” is no more than 200 mm.

Models are available with and without grooves and ridges to facilitate laying. You can choose any aerated concrete, but the option with additions will be a little more expensive. As for the manufacturer, products from popular brands usually cost more. The location of the plant also matters - logistics costs are also included in the total cost.

Advantages and disadvantages of aerated concrete

The structure with voids gives lightness to the material. It is convenient to work with it, and there is no need to use powerful lifting equipment. The created structure weighs relatively little, therefore reducing the cost of building a foundation. The building turns out to be warm and durable. The material of inorganic nature is not afraid of rot and rodents. It is completely non-toxic.

Among the disadvantages is fragility. Because of this, it is worth purchasing material with a reserve. Aerated concrete is also hygroscopic. It quickly absorbs moisture, making it difficult Finishing work. The solution is to pre-prime the modules.

How much does it cost to build a house from aerated concrete?

The material is valued at an affordable price. A house made from it will be cheaper than, for example, from timber or brick. However, it all depends on the complexity of the layout, type of foundation, costs Consumables and other factors. On average, the cost of work is 20,000 – 24,000 thousand rubles/m2. This means a turnkey facility.

Our company “Krasnovodsk-DomStroyProfi” specializes in the construction of strong and durable houses from aerated concrete. With extensive experience, we complete orders in the shortest possible time. We hold various promotions for our clients and provide discounts on individual projects. Order construction from our successful company and get a house with excellent performance characteristics.

Built country house By frame technology plus small veranda. The cost turned out to be quite economical, and the time frame was 3 and a half months. We even finished it a couple of weeks earlier than promised. We only go to the dacha in the summer, so I can’t say anything about thermal insulation. Thank you

Thank you very much for building a house made of aerated concrete. The quality of both the material and work is excellent - FRIENDS WILL BE JEALOUS. The time frame for completed work is approximately 4.5 months. empty space the house was built. Good luck to all of you, good clients and big houses!!


They built our house in 3 months (they started the foundation at the end of summer, and finished the walls and interior decoration) , it didn’t turn out cheap, but everything was thought out, our participation was minimal. This year we are building a bathhouse together with them! Thank you for such professional guys that you provided us with!


Thank you so much for your work and attitude! Everything is efficient, high quality, fast! Thanks to the team led by Alexey!


The company built me ​​a great one summer house! I don’t have any complaints about the company; next summer I’m going to build a bathhouse and a garage. I’ll definitely contact them. Thanks to everyone, especially Sergei’s team, who built it for me, a lot depends on them!


We built a house from aerated concrete in your company - I’m very pleased. The house was erected on our pre-prepared foundation in 45 days. And as a gift we received home insurance for a year. So I recommend it.


In August 2017 I ordered the foundation ( monolithic slab) for a house in the Leningrad region. In 2018 I already ordered the house itself. I can recommend it because... We were pleased with the result. Everything was done quickly and professionally.


We ordered a house and garage from this company in the summer of 2016. The builders worked for about 4 months, without a break (they really liked it). Everything was done according to the agreement, no extra money was asked.


Frequently asked questions before construction

About company

How long has your company been in business?

Our company began work as a repair and finishing company in 2007. From that moment on, we have grown into the construction industry and all thanks to our employees. Special thanks for the work invested in the development of the company.

How is the competence of specialists confirmed?

All architects and engineers of the company have qualification certificates. Because the project is not subject to a company license, but to an architect’s certificate. By law, responsibility for the project lies with the architect.

Does your company do all the work? Or do you use contractors?

  • We ourselves carry out general construction, finishing work, site arrangement, wiring engineering systems(electricity, heating around the house, water supply) and so on.
  • We invite contractors to work that we do not perform every day and require specialization, for example: production and installation of windows and doors (special orders), air conditioning systems, boiler room equipment, installation of wells, septic tanks.
  • Searching, attracting, complying with agreements and monitoring the performance of work by contractors is our task.
  • We carry out 80% of all work on the construction of your home ourselves and only 20% involve contractors.
  • We enter into an agreement with each contractor in which he specifies a guarantee for the work performed by him, and in case of malfunctions, their elimination is the responsibility of the contractor.

Is it possible to see objects that are currently in operation?

Yes, there are objects that we can show at different stages works and already completed houses by prior arrangement.

about the project

Should I buy a standard project or order an individual one?

Buy finished project.

  • Plus is the price.
  • The downside is that it will not include all your wishes regarding materials and layouts. Also, it will require modification to suit the characteristics of your site.

Buy a ready-made project and modify it.

It all depends on the changes you want to make. It is possible that developing an individual project will be more profitable for you than modifying a standard one.

The cost of such modifications must be discussed at the meeting.

Development individual project Houses.

  • Pros: all your wishes regarding all characteristics of the house and site are taken into account.
  • The downside is that the cost of such a project is higher than a standard one.

BUT! You can develop an individual project for free. If our company builds, then the development of an individual project is free for you.

How is an individual project developed?

  • The development of an individual project begins with the signing of a contract and the first meeting with the architects, at which the client voices his wishes. Based on the results of the meeting, a design assignment is drawn up, which is an annex to the contract.
  • Architects prepare several versions of sketches and decide with the client in which direction to move next. During the entire design period, several meetings take place with the client, at which all architectural and design solutions are worked out in detail until the client is satisfied with everything, which he confirms with a signature on the Draft Design.
  • Next, a working draft is developed. This is the calculation phase of each design solution in which the client is not involved.
  • This entire process takes from 2 weeks to 2 months, after which the client receives a finished project with ready-made detailed calculations, which is necessary when submitting documents for a building permit.

About construction

Will you go to the site where construction is planned?

Yes. When inspecting the site, we take into account the size, access from the road and its width, the proximity of neighboring buildings, the presence of a slope or drop, cardinal directions and what kind of soil is on the site.

Do you help with choosing a site for construction?

Yes. Our specialists help with site selection. They will help you find it according to your requirements on the Internet with advertisements.

What influences the final price of a home?

The cost of building a house is affected by:

  • site features: relief, entry conditions, location
  • materials used in construction
  • house architecture features
  • work conditions (working time restrictions)

What guarantees do you provide?

We provide a 3-year guarantee on our work. The manufacturer provides a guarantee for materials and it is different in each case. There are materials for which the manufacturer provides a lifetime warranty.

How can I control construction?

  • We send each client step by step photo work report.
  • We install online video surveillance of the facility 24 hours a day, you and the company’s specialists have access to it (paid service).
  • You can also use the services of companies that provide technical control.
  • The construction is carried out in stages, you always see which stage and only after accepting one, we proceed to the next.

When is the contract signed?

  • The design contract is signed at the meeting, before the first communication with the architect.
  • The construction contract is signed after the estimate has been developed and approved.

When should I pay for your work?

For design, an advance payment is required within 5 days after signing the contract in the amount of 70% of the total amount. The balance is paid upon delivery of the finished project to the client.

Payment for construction is broken down according to the stages specified in the estimate. Each stage of construction is also divided into payments, the size of which may vary (usually due to the need to purchase materials)

How are builders placed?

  1. It will be convenient if you have the opportunity to place builders near the construction site, it will be suitable garden house, construction trailer, an old house or any other building with a roof.
  2. If there is nothing like that, then we are ready to bring our change house for FREE.
  3. In extreme cases, we will accommodate our builders in a nearby hostel

What communications are needed to start construction: electricity, water?

Electricity with a power of at least 5 kW and technical water.

If this is not the case, then we will bring our generators FREE OF CHARGE. In most cases, water wood construction used only for household needs, we will provide its delivery on our own.

What time of year do you carry out construction?

We build all year round, one of important conditions in the spring-autumn period this is a suitable road for vehicle access.

WHAT CAN WE DO FOR YOU?

We will help you save by correctly calculating the estimate and choosing high-quality materials.

Perform quality project documentation, thanks to which you can not worry about the design decisions made.

We work throughout the Moscow region

Volokolamsk district, Voskresensky district, Dmitrovsky district, Yegoryevsky district, Zaraisky district, Istra district, Kashirsky district, Klinsky district, Kolomna district, Krasnogorsky district, Leninsky district, Lotoshinsky district, Lukhovitsky district, Lyuberetsky district, Mozhaisk district, Mytishchi district, Naro-Fominsk district, Noginsk district, Odintsovo district, Ozersky district, Orekhovo-Zuevsky district, Pavlovo-Posadsky district, Podolsky district, Pushkinsky district, Ramensky district, Ruza district, Sergiev Posad district, Serebryano-Prudsky district, Serpukhov district, Solnechnogorsk district, Stupinsky district, Taldomsky district, Chekhov district, Shatursky district, Shakhovsky district, Shchelkovsky district.

If you decide to build a house from aerated concrete, then you have three options, the first of which is to completely entrust the work to professionals, the second is to build it yourself, and the third is to partially hire experienced workers.

To the question “how much does a house made of aerated concrete cost,” we will try to give an extensive answer, which should help you decide on the appropriateness of your choice when compared with others building materials, such as brick, ceramics, wood concrete and others.

Building a house consists of many stages, but in short: foundation, frame, roof. We will describe the construction in more detail and indicate approximate cost for materials and work, although prices may vary greatly in different regions of the country.

Any construction begins with house project and soil research, surveyors are engaged in such work.

They take a soil sample from a depth of a couple of meters and determine the optimal foundation required for the future structure. Also, builders need a change room - a room for storing materials, tools, clothes and other necessary things.

If you already have such a room on your site, you will save a little. If you don’t have one, then you can rent a cabin (trailer) for $50-200 a month.

Foundation for a house made of aerated concrete, prices

Approximate cost of foundations for a 10x10 m house.

  1. Monolithic (slab) – 400 - 600 t.r.
  2. Belt recessed - 200 – 300 tr.
  3. Shallow belt – 170 t.r.
  4. Pile-grillage – 200t.r.

The most expensive is monolithic, for example, a 10 by 10 meter slab will cost approximately 500 rubles. This includes all work and materials. If you do all the work yourself, it will cost about 200-250 rubles for materials.

To simplify, we will carry out all calculations for a house 10 by 10 meters with an attic. We will calculate the roof separately below in the article.

Perimeter external walls houses - 40 meters

40*2.5 – 20 = 80 m2 – the area of ​​the external walls of the first floor, taking into account windows and doors.

40*1.5 = 60 m2 - the approximate area of ​​the attic walls and gables.

Square load-bearing walls– 160 m2. of which the area of ​​external walls is 140 m2.

The approximate area of ​​partitions in the house is 50 m2.

The number of cubes of aerated concrete for load-bearing walls is 160 m2 * 0.375 = 60 m3.

The number of cubes of aerated concrete for internal partitions 20 cm thick is 50 * 0.2 = 10 m3.

The cost of aerated concrete for load-bearing walls is 60 * 3000 = 180,000 rubles.

Cost of aerated concrete for interior walls– 10* 3000 = 30,000 rub.

The total cost of aerated concrete is 210,000 rubles.

Number of glue bags 25 kg for masonry, with the calculation of 1.5 bags per cube of aerated concrete - 60 + 10 * 1.5 = 105 bags.

The cost of a bag of glue (25 kg) is 250 rubles per bag.

The total cost of glue is 105 * 250 = 26,250 rubles.

If you plan to use aerated concrete 20 cm thick, then the cost of aerated blocks will be reduced by half, as well as glue.

Calculation of reinforcement for aerated concrete reinforcement

Reinforcement for every 4th row of blocks

Number of reinforced rows – 5

Reinforcement bars in a row – 4

The thickness of the reinforcement is 8 mm.

The reinforcement perimeter is 50 m2.

The total length of the reinforcement with a margin is 5*4*50 = 1000m.

The cost of fittings is 15,000 rubles.

The cost of glue for fittings is 2000 rubles.

The average price of an armored belt, taking into account materials and work, is about 1,500 rubles per linear meter, around our house perimeter, an armored belt will cost about 75,000 rubles.

Floors in aerated concrete houses, price



Cost of materials for floors 100 m2:

  1. Wooden – 50,000 rub.
  2. Aerated concrete slabs RUR 250,000
  3. Hollow concrete plates(terriva) – 120,000 rub.
  4. Monolithic reinforced concrete floors – 250,000 rub.

Roofing a house made of aerated concrete

Depending on the angle of the roof slope, the roof area will be from 120 to 150 m2 .

Rafter system – 100 t.r.

Roofing material – 70-200 t.r.

Roof insulation with mineral wool – 20 - 50 t.r.

IN rafter system includes: mauerlat, rafter beams, rafters, counter-lattice, sheathing.

Roofing materials include: waterproofing, vapor-permeable membrane, and the roof itself, including ebbs, ridge and other drainage elements. As roofing material can be slate, ondulin, metal tiles, flexible tiles, ceramic tiles.

Since the main heat loss occurs on the roof, its insulation mineral wool simply necessary. Required thickness insulation is 10-20 cm.

Stone square Rockwool cotton wool, 100 mm thick. will cost 120 rubles.

150 squares of cotton wool will cost from 20 to 40 tr. depending on thickness.

Cost of stages and materials for a house made of aerated concrete

  1. Foundation – 200-400 t.r.
  2. Aerated concrete – 210,000 rub.
  3. Adhesive for aerated concrete – 26,000 rub.
  4. Fittings for masonry – 15,000 rub.
  5. Armopoyas – 40,000 rub.
  6. Overlapping - from 50 to 250 tr.
  7. Roofing – from 200 to 400 t.r.

Thus, materials for a house made of aerated concrete without communications, internal and exterior finishing will cost approximately 800,000 - 1,300,000 rubles. If you hire/rent special equipment and workers, the cost of the house will increase by about one and a half to two times.

Also, don’t forget about the interior and exterior decoration of your home. The most economical option external finishing is siding, the price of which is about 400 rubles/m2.

Cost of aerated concrete house



 
Articles By topic:
How and how much to bake beef
Baking meat in the oven is popular among housewives. If all the rules are followed, the finished dish is served hot and cold, and slices are made for sandwiches. Beef in the oven will become a dish of the day if you pay attention to preparing the meat for baking. If you don't take into account
Why do the testicles itch and what to do to get rid of the discomfort?
Many men are interested in why their balls begin to itch and how to eliminate this cause. Some believe that this is due to uncomfortable underwear, while others think that it is due to irregular hygiene. One way or another, this problem needs to be solved.
Why do eggs itch?
Minced meat for beef and pork cutlets: recipe with photo
Why do eggs itch?
Schemes for launching spacecraft Orbits of artificial Earth satellites