Projects of 1 5 storey buildings. Projects of one-story houses: pros and cons. Which house to choose

It often happens that for construction one-story house The plot size is not enough, and there is no need for a house with two full levels, and not every developer can afford it financially. In this case, the ideal solution would be to build a house with one and a half floors.

The cost of houses with level differences is much lower compared to two-story ones; they are easier to build and have less load on the foundation. The construction process itself will proceed faster, and this will ensure that the owner moves into the long-awaited home as quickly as possible.

Features of one-and-a-half-story houses

What is it? This is a layout option in which one part of the house is designed on two levels, and the other on only one. In this case, the living room, kitchen, dining room - premises related to the active zone are located in the part that has a height of one floor. Bedrooms are usually located half a floor above the living area, and various kinds technical and auxiliary rooms are below. So we get an increase usable area buildings on the same square meters plot.

307A “Majestic” is a modern cottage with a garage, one and a half floors.

If you plan to use the space under the roof, you should distinguish attic floor from a semi-attic, the height of the walls of which, as a rule, does not exceed 80 centimeters.

Category content

  • and - projects in which the living-dining room is at the zero level, and the bedrooms are located 1.3 meters higher. The base is lowered by 1.5 m and is designed to accommodate a sauna with a relaxation room and utility rooms.
  • The area of ​​the base can vary with the same functional load and be larger, as in a cottage and with a double-height living room, where the attic is equipped with a billiard room and there are two storage rooms.
  • Due to the differences in level, the house can have a lot of amenities, including a garage, which is part of it, while part of the living room space can be designed as double-height, as in. A garage designed for two cars is also possible, as in the modification of the project -.

One of the advantages of a one-and-a-half-story home is that there is no need for multi-step stairs, which can be a problem for older people and dangerous if there are small children in the house.

Consistent with your financial capabilities, having discussed your requirements for future housing, and also having considered the proposals of our architectural and planning studio on this website, you can choose the project you like from ready-made options. It is possible to make the necessary changes at your request, if they are not very deep. In the latter case, we can create an individual original project. In each option you will receive a complete package of drawings and documentation necessary for construction.


HOUSE EQUIPMENT

The wall kit price includes:

Design drawings and specifications of the bathhouse (AR, KR);
- production of timber for construction. Northern forest, Kostroma region;
- waterproofing the foundation with roofing felt;
- embedded (tying) row of timber 150 x 150 mm;
- treatment of the embedded crown with an antiseptic;
- external, main walls made of timber 150 x 150 mm (corrugated timber 145 x 140 mm);
- interior walls from timber 150 x 100 mm (profiled timber 145 x 90 mm);
- pediments chopped from timber 150 x 150 mm (profiled timber 145 x 140 mm);
- ceiling height: 1st floor - 2 m 70 cm, 2nd floor - 2 m 50 cm;
- timber connection “warm corner”;
- assembly of the log house on wooden dowels according to technology;
- interventional insulation - jute fabric;
- floor joists - made of timber 150 x 100 mm in increments of 0.6 m;
- ceiling beams - made of timber 150 x 100 mm with a pitch of 0.6 m;
- compensation jacks under the terrace, porch;
- delivery, unloading of the log house and components;
- installation of the house kit by an experienced team (Russians);
- quality control of materials and work.

FOUNDATION

The most suitable foundations for construction timber house are:

Tape monolithic;
- pile - screw;
- on reinforced concrete piles.

Our construction teams can build any type of foundation with high quality.

ROOF

The basic package includes installation roofing system and covering the roof with temporary roofing:

Rafters from edged boards 150 x 50 mm in increments of 0.6 m;
- installation of rafters is carried out on sliding supports;
- crossbar for stops made of edged boards 150 x 50 mm;
- roof sheathing from edged boards 150 x 20 mm;
- roofing material (roofing felt).

At the request of the client we can fulfill roofing using metal tiles, soft bitumen roofing or ondulin.

3 gifts are already included!

ABOUT THE EQUIPMENT

Our clients are offered inexpensive basic equipment for shrink-fit construction, which allows the first initial stage put the frame of the house under the roof, and then begin to carry out finishing works. If necessary, the company’s specialists will calculate the cost of additional options.

The cost of this house is calculated taking into account classic sawn timber 150 x 150 mm and profiled timber 145 x 145 mm. At the request of the client, the log house can be built from timber bigger size. For the construction of country houses, in most cases, profiled timber 145 x 145 mm is used. Houses built with timber wall thicknesses from 195 mm (200 mm) are ideal for year-round residence. Increasing the thickness of timber walls will reduce the heat loss of the building. Each of the proposed types of timber has its own advantages. For example, beams processed mechanically on special equipment, with external and inside obtain a geometrically even shape and have smooth surface, which will significantly reduce the cost of finishing work in the future. IN modern housing construction Increasingly, dry chamber-drying timber is being used, the properties of which make it possible to begin interior or exterior finishing immediately after assembling the house kit.

The price of building a turnkey house is calculated individually.

For the manufacture of house kits from timber, environmentally friendly wood from the Kostroma region is used.

PHOTO REPORTS

Stages of building a house made of timber

Foundation installation

The foundation for a house should be selected based on the characteristics of the building site and the size of the log house. When building houses from timber, they are used Various types foundations. The choice of foundation type may depend not only on financial costs, but also on the individual characteristics of the area. In some cases, it is necessary to carry out engineering - geological surveys, during which the properties of the soil are studied and the location for construction is determined. Timely geology of the site also allows you to avoid mistakes at the initial stage during design and select the appropriate type of foundation for the structure.

Assembling a log house

The assembly of a log house from timber (profiled timber) can be done at any time of the year. To build a house, timber 150 x 150 mm or profiled timber 145 x 145 mm are often used. If necessary, our company can build a larger house from timber. As inter-crown insulation during construction timber houses jute fabric is used. Our company also invites you to order a log house made from chamber-dried timber, which is currently increasingly used in private country construction.

Roofing

Currently, a variety of roofing materials are used in the construction of timber houses. The most popular are metal tiles, ondulin and soft tiles. The basic package for building a house includes temporary roofing with roofing felt. If the customer wishes, the company’s specialists can produce installation work using the most modern roofing materials, immediately after assembling the frame of the house. The cost and timing of the work depend on the complexity of the design.

Shrinkage of a log house

The frame of a house made of ordinary or profiled timber of natural moisture must be settled and shrink before finishing work begins. During the shrinkage process of a log house, the wood shrinks naturally. In addition, a slight decrease in the linear dimensions of structural elements may occur. The technological break after assembling the frame until finishing can last up to 6 months. Modern technologies wood processing makes it possible to produce a house kit from chamber-drying timber.

Turnkey house finishing

The final stage of construction is fine finishing turnkey houses. The cost of finishing work directly depends on the materials used. During the internal and exterior finishing of the log house, the walls are sanded and painted. The finishing process also includes: insulation of ceilings and floors; production of door casings and window openings, their installation and cashing. Specialists of the company "Lesoresurs" affordable price will produce quality installation windows and doors, device drainage system and hemming of roof overhangs, as well as wastewater treatment facilities.

POPULAR PROJECTS

    What was done

    Project: the Innsbruck project was adapted to the site and the wishes of the Customer's family, and a solution was proposed to move the terrace.
    foundation: based on geology and the architect’s calculations, the house was built on a pile-grill foundation.
    ceilings: basement - reinforced concrete monolithic; interfloor - reinforced concrete floor slabs.
    box: walls made of aerated concrete blocks, masonry with masonry glue. Windows are made to order, with one-sided lamination, installation on site.
    roof: metal tiles.
    exterior decoration: the walls are insulated with basalt facade insulation and plastered, the finishing elements are made of wood, made locally, based on technical specifications visualization, painted. The base is laid out decorative stone.
    interior finishing: finishing was carried out according to the design project, where the combination was taken as the basis decorative plaster with stone and wood. False beams were installed on the ceilings.
    additionally: a fireplace has been installed and finished.

    What was done

    This is the very case when our Customer and we speak the same language and are inspired by the ECO high-tech style! Designer Ilya came to us with a ready-made Project for his future home! Our team liked the project - it’s so unusual and stylish solutions It's always a professional challenge!
    We prepared estimates for Ilya and developed unique Constructive decisions- all this allowed us to implement this project! Frame house made in our proven Canadian technology with 200 mm insulation along the entire contour! The outside of the house is sheathed with imitation timber. All windows are made according to individual order and laminated in colors according to the project. Additional accents are placed thanks to professional painting of imitation timber and selection of paints.

    What was done

    What does it cost us to build a house? Indeed, having a team of professionals and knowledge, building a house from scratch is a matter of time! But sometimes the task is more difficult! We have introductory ones - an existing foundation, or buildings on the site, extensions to existing buildings and much more! For the Matsuev family it was exactly this not an easy task. They had a foundation from an old house that had burned down, and landscaped area Around him! The new house had to be built in a short time on the existing foundation. Dmitry and his family had a desire to build new house in high-tech style. After careful measurements, a design was made that took into account the old layout, but had a new one modern form with interesting innovations! appeared at home entry group, where you can sit at a table on cozy evenings and a complex but possible exploitable roof in our area. To implement such a roof, we called on our knowledge and modern Construction Materials LVL beams, built-up roofing and much more. Now in the summer you can have an unusual dinner on such a roof or watch the stars at night! In the decoration, our architect also emphasized the minimalistic and graphic high-tech style. Smooth plastered walls with painted plank details, and wooden beams at the entrance added personality. The inside of the house is finished with imitation timber, which is painted in different colors depending on the purpose of the room! Large windows in the living room kitchen overlooking the site created the desired effect of illumination and airiness of the space! The house of the Matsuev family - decorated our photo gallery in the section country architecture in high-tech style, the style chosen by brave Customers with excellent taste.

    What was done

    Olga and her family have long dreamed of a country house! A reliable, solid home for living that will fit perfectly into their difficult narrow plot! With the advent of children, it was decided to make the dream come true; children grow quickly and in own home There are many opportunities in nature and Fresh air. We, in turn, were glad to work on an individual house project in classic style made of red brick with a bay window! After the first acquaintance with our company in a cozy office, we invited Olga to take a look at our current construction site: evaluate the order and construction processes, storage of materials on site, get acquainted with the construction team, make sure the quality of the work. After visiting the site, Olga decided to work with us! And we were glad to do our favorite job again to make another country dream come true!

    What was done

    Project: changes were made to the San Rafael project and redevelopment was done according to the wishes of the Customer.
    floors: basement - reinforced concrete floor slabs; interfloor - reinforced concrete floor slabs
    box: walls made of expanded clay concrete blocks, masonry with mortar??? Windows have been installed.
    roof: metal tiles
    terrace: rough fencing elements have been completed, flooring has been installed.

    What was done

    Dmitry contacted our company with an interesting preliminary design to calculate the cost. Our experience allows us to perform such calculations based on preliminary designs with minimal errors, no more than 2%. Having visited our construction sites and received the cost of construction, Dmitry chose us from many of our colleagues in the workshop to complete the project. Our team began to carry out a difficult and expressive country project with spacious premises and garage, large windows and complex architecture. After the project was completed, Dmitry chose us as a contractor company, and we, in turn, wanted to do further work on the same high level! Since the object is large, Dmitry proposed stage-by-stage cooperation, namely, upon successful completion of the foundation work, we began the second part of the project - walls + floors + roofing. Also important for Dmitry exact dates construction, in order to speed up the construction processes, the team was reinforced by 2 experienced masons.
    The box on a pile-grillage foundation was delivered right on time! The result pleased us and the Customer. All stages of the work were coordinated and worked out for Dmitry and his individual project, which benefited all participants in the process!

    What was done

    Project: The project of our company Inkerman was changed taking into account the wishes of the Customer’s family, the house was planted on the site, taking into account the existing situation on the site and the relief
    foundation: based on geology and the architect’s calculations, the house was built on a reinforced pile-grillage foundation.
    ceilings: wooden on wooden beams, in places large spans installation of LVL beams. Basement ceiling insulated basalt insulation in 200mm; interfloor covering with 150mm sound insulation.
    box: box: walls made of expanded clay concrete blocks, masonry with mortar. Windows have been installed.
    roofing: installation of metal tiles.
    external finishing: the facade is insulated with basalt facade slabs 100 mm, fronts closed facing bricks; color scheme proposed by the architect and agreed with the Customer.

    What was done

    The Krutov family decided to build a spacious house for the whole family to live in!
    Olga and other family members went from idea to implementation in several stages! Choice of technology long work on the project, building the foundation, building the house with exterior finishing and then working on the interior decoration! Frame technology was chosen as energy-saving, prefabricated and high-tech! Why did the Krutovs choose our company? They were pleased with the quality of work on our construction site and the workers who gave us a detailed tour! We also worked on the estimate for a long time, combining different variants finishes, comparing their costs. This allowed me to choose best option from a wide variety finishing materials and complete sets.
    The project was created by an architect friend, but we had to work out the constructive part of it. After which the most reliable and effective foundation was erected - USHP. Next, work began on the box. Frame house with 200 mm insulation along the entire contour and unique technology roof insulation 300 mm. For the exterior decoration, siding was chosen in a spectacular combination of colors - coffee and cream. Accents are placed thanks to powerful roof overhangs, an interfloor belt and large windows!

    What was done

    When you decide to become the proud owner own home and move to a new home for permanent residence, first of all, you think about what the house will be like; what to build it from; how much will it cost and most importantly, WHO will do all this?
    Alexander, came to our company with the desire to move to his own Vacation home. He liked the Avignon project and there was already a strip foundation. After the initial visit to the site, measurements and inspection of the foundation, we gave our conclusions and recommendations. Strengthen the foundation, change the project and adapt it to the size of the existing foundation! After agreeing on the cost, it was decided to build in winter. Alexander received reinforced concrete floors as a gift, one of the leading construction crews and a house according to the design you liked, standing on a plot with exterior finishing by spring! Alexander observed every stage of construction, regularly visiting the construction site and was pleased with the result, and we were pleased with our work. This is an individually designed Avignon project, implemented in stone technology with external insulation and siding finishing!

    What was done

    Each house is a separate story of creation and implementation! One day we built a house good people and they recommended us to another good person! Rumyantsev Andrey came to our company with a desire to replace the old country house to build a one-story spacious country house with a fireplace for warm family evenings... It was decided to build the house from aerated concrete blocks so that the future country handsome man would delight the owner for decades! The customer voiced his wishes for finishing - and we, in turn, brought everything to life. Thanks to detailed visualization of the project, each element of the exterior decoration is a member of a friendly ensemble! Bavarian masonry, as the final stage of exterior decoration, looks noble and thorough. Without a doubt, such a tandem - aerated concrete and brick can be safely called the best solution in the field of stone house construction - warm, affordable, beautiful, reliable. Modern technologies have advanced so much that such unique configurations become available in a short time, because we built this project in winter months. The main thing is to have the necessary knowledge and constantly replenish it!

    What was done

    Project: the project of a European company was taken as a basis and was adapted to the site and the wishes of the Customer’s family; a terrace and patio were proposed, taking into account the cardinal directions on the Customer’s site.
    foundation: based on geology and the architect’s calculations, the house was built on a pile-and-grid foundation.
    ceilings: basement - reinforced concrete monolithic; interfloor - wooden on beams with a 150 mm sound insulation device.
    box: walls made of aerated concrete blocks, masonry with masonry glue. Windows are made to order with one-sided lamination, installation on site.
    roof: metal tiles.
    Exterior finishing: the walls are insulated with basalt facade insulation and plastered. Based on visualizations added façade panels under the Tolento stone. The enclosing elements of the terrace and balcony are made of wood, made locally, based on technical specifications visualization, and painted. The roof overhangs are lined with soffits matching the color of the roof.

    Vladimir Murashkin,

    The owner of a house “brought to life according to his idea and sketch!”

    House parameters:

    What was done

    When Customers come to us with bright, modern ideas future home, we light up doubly! After all, work on a new stylish project it’s always interesting and a challenge, how to implement everything bold ideas from a constructive point of view, what materials should be used? Vladimir bought a plot of land with picturesque views of the Oka bank! This view could not be ignored, so an indispensable attribute of the future house was a dizzying terrace (51.1 m2) and large balcony oriented to beauty! Vladimir wanted to relax in nature in wooden house, and it was necessary to build a house in a short time and ideal solution became for such tasks frame technology construction! If we’re going to be different, it’s in everything! The house was made even more spectacular by the vertical finishing of imitation timber made of durable larch, painted in natural shades with emphasized wood texture. Laminated windows complement the modern look of the house! It turned out to be an excellent country house, with highlights and at the same time incredibly functional.

    It all started with individual project, found by the Customer’s family on a European website. It was with him that she came to our office for the first time. We made preliminary calculations for the project, took a tour of the existing construction site, shook hands and work began to boil! The architect improved and adapted the project to the site and the Client’s family; the foreman “planted” the house on the site. Based on geological surveys, it was decided to place the house on bored piles. The frame grew in a few weeks, then the roofing, insulation, exterior finishing! Behind winter period a house grew on the site. The customer invited a third-party technical supervisor who monitored the process independently of our multi-stage control. The color for painting the imitation timber was selected by our manager and here in front of us is the bright and cozy country house of the Pushkov family’s dreams!

Greetings to everyone reading this topic. I will try to briefly, without unnecessary words, state the essence of the issues. I was puzzled by building a house. Inner dimensions 9.6 x 7.6 m. Strip foundation, with a sole. Basement - 4 rows of bricks. Aerated concrete walls, floors -wooden beams. Attic. The staircase to the attic is made of wood. IN Lately I'm thinking about a terrace on the courtyard side.
1. Region: South-West of Bashkiria.
2. Wall material: foam (gas) concrete 300mm + ventilated. facade, roof - metal.
3. Plot 15 acres. (30x50m). The soil is loamy. The slope is south (3%). On the east side, three km. there are mountains. The house is one and a half floors. The height of the 1st floor is 2.8 m. The attic is from 1.45 to 2.45 m. The location is indicated in image No. 1.
4. Permanent accommodation.
5. Boiler room in the house. I haven’t decided specifically on the type of boiler.
6. House for 1-2 people.
7. The boiler room (aka boiler room) will be a kind of technical room, in which there is no need to hide/ennoble the communications wiring. There will be a supply of water, gas, electricity and sewerage. It should be located in the far right corner (see image No. 2). Entry is required from the yard.
8. Boiler room with a volume of 16.2 cubic meters.
9. Summary of some issues:
- a separate vestibule has been implemented to reduce heat loss.

Kitchen and living room should be 2 separate rooms. I allow an opening-window with a folding(?) tabletop in the adjacent wall. A kind of mini bar counter.

The sleeping area is located on the second floor.

There is no need for an isolated dirty hallway area.

There should be a control room on the second floor. The bath/shower stall is located on the ground floor.

Entrance to the SU is not important. In general, I assume a combined control system, separated by a light partition.

The kitchen work area should be located along outer wall. In image No. 3 green sewerage shown.

1. The stairs look awkward. Steps for the ceiling 1st floor. 3 meters is not enough. Yes, it takes up space, but in general the large hall on the first floor is not very functional. I would sacrifice them in favor of a normal staircase. The staircase is both safety and convenience. If you are building for yourself, think about it: you will also have to hobble up this ladder in retirement. Don't save money.
2. You can make the entrance to the boiler room from a vestibule. This will allow (if necessary) to move the vestibule slightly to the left (so that a normal staircase can fit in) and the hall will become more functional (you can make some kind of closet in this corner).
3. It is not clear from the inside load-bearing wall. In theory, this should be the wall between the bathroom-hall and the kitchen-living room. It should be thicker than the other partitions. Now the wall between the kitchen and living room is thicker.

Many people choose to buy a house on one and a half floors, since such projects have a number of advantages:

  • Saving. A full second floor requires more expense than an attic space adapted for human habitation;
    Comfort. The attic is no less comfortable than an ordinary room; during construction, the roof elements are additionally insulated;
  • Ecological cleanliness. One-and-a-half-story buildings, so popular in Moscow and the surrounding area, will be as safe for humans as other houses made of timber

Housing of this type owes its name to the fact that the first floor, made of logs or timber, is significantly higher in height than the second, the walls of which are made of wooden shields. The area of ​​such a building is no less than that of a two-story building, but the cost of a one-and-a-half-story house compares favorably with its competitors.

Projects of houses made of timber up to 100 sq.m.

In our catalog you will find ready-made projects houses made of timber with an area of ​​6x9 meters. By choosing one of them, you can find out the cost of building a 1.5-story building, get acquainted with the layout diagram and other accompanying information.

For building a house up to 100 sq. m you can use different types of wood:

  • Larch, cedar. Expensive type of wood, different good characteristics and giving the house a unique microclimate;
  • Conifers. One of the most affordable varieties with beautiful texture. Needs to additional processing antiseptic compounds;
  • Linden. This wood continues to be used in construction, but it is not very suitable for residential buildings; instead, it can be used in the construction of a bathhouse;
  • Oak. The material is very difficult to process, so 6x9 houses are rarely built from it. According to their own strength characteristics he's approaching natural stone, but at the same time continues to “breathe” and retains heat perfectly.

We use the most modern construction technologies, therefore, every house created according to our designs will fully comply with those climatic conditions, which distinguishes Moscow and its surroundings.



 
Articles By topic:
Why do the testicles itch and what can you do to get rid of the discomfort?
Many men are interested in why their balls begin to itch and how to eliminate this cause. Some believe that this is due to uncomfortable underwear, while others think that it is due to irregular hygiene. One way or another, this problem needs to be solved.
Why do eggs itch?
Minced meat for beef and pork cutlets: recipe with photo
Schemes for launching spacecraft Orbits of artificial Earth satellites
1 2 3 Ptuf 53 · 10-09-2014 The union is certainly good. but the cost of removing 1 kg of cargo is still prohibitive. Previously, we discussed methods of delivering people into orbit, but I would like to discuss alternative methods of delivering cargo to rockets (agree with
Grilled fish is the most delicious and aromatic dish
The peculiarity of cooking fish on the grill is that no matter how you fry the fish - whole or in pieces, you should not remove the skin. The fish carcass must be cut very carefully - try to cut it in such a way that the head and