Technical report on the condition of the sewer collector. Inspection of the performance of engineering systems. Design of buildings and structures

In what cases is the examination carried out? utility networks buildings. List of primary documentation for starting a communications survey, conducting an examination and drawing up a technical report.

A comprehensive analysis of buildings requires an examination of external utility networks and internal systems communications to determine technical condition equipment and its elements. The expert assessment procedure is mandatory when it is necessary to justify a decision on the possibility of complete or partial reconstruction, overhaul and modernization of the object under study.

The essence of the survey is to study functional characteristics, their compliance with current technical standards and design executive documentation water pipelines, sewerage, ventilation shafts, heating systems, gas supply and other engineering equipment. Based on the data obtained, specialists will be able to provide recommendations on the operation or dismantling of old ones, the design of new utility networks and systems, determine the possibility of connecting additional equipment and calculate the amount of work.

Technical documentation for starting a communications survey

According to regulations, before starting work, surveyors must familiarize themselves with the current technical documentation of the building's utility networks.



Drawing up a work plan, setting tasks and examination to assess the technical condition is carried out for the following objects:

  • multi-storey residential buildings and cottage communities;
  • public institutions(hospitals, clinics, kindergartens, schools, educational establishments);
  • office buildings (including the surrounding area);
  • industrial facilities, warehouse and production facilities;
  • technical structures and agricultural buildings;
  • sports centers, stadiums, ice palaces;
  • construction of urban infrastructure.

For the purpose of primary research, survey engineers study drawings (executive and working), acceptance and testing certificates, technical passports equipment used in engineering networks, certificates for operation. All standards, work regulations and requirements are set out in GOST R 53778-2010.

Scope of work on the study of utility networks

In every special case carry out not only an analysis of technical documentation, but also instrumental diagnostics, and also visually inspect all important nodes in order to search for defects and worn parts. In addition, surveyors Promterra company, if necessary, search for hidden underground communications using special equipment.



The performers are faced with many functional tasks, since in the process it is necessary to inspect internal and external utility networks and assess the technical condition:

  • hot and cold water supply;
  • heating and heat supply;
  • internal ventilation systems;
  • sewerage and waste disposal;
  • gas supply systems;
  • drains and heating systems;
  • external electrical networks;
  • engineering equipment.

Equipment that is physically worn out and outdated must be replaced. To confirm, specialists perform verification calculations. The survey allows you to assess the scope of work, including financial costs. If necessary, instrumental measurements of places and elements can be selectively assigned. During the examination, it is necessary to take clear photographs of the detected damage.

Technical conclusion and deadlines for the examination

How much time it will take for a high-quality inspection of the foundation and underground part of a building with the presence of utility networks depends on several factors: the complexity of the object under study and its size, customer requirements and the need for detailed data, technical characteristics communications, the density of their placement, the features of the structure. Performers set the terms and volumes of expert work on an individual basis.




Upon completion of the examination of all external and internal communication systems, a technical report is drawn up. It displays the results of research, brief terms and conditions operation of utility networks, analysis of the facility in accordance with the requirements regulatory documents and the expected causes of the detected defects. One of the important sections of the conclusion is the rationale design solutions which are required for the repair or modernization of water supply systems, heating networks, sewerage, ventilation and electrical networks

buildings or areas. SRO certificates must be attached at the end of the document.

  • 1. We conduct inspections of engineering systems in the following scope: Inspection of hot water supply systems - description DHW systems , pipeline inspection and circulation pumps , description of cooking technology and used water heaters, carrying out instrumental measurements - temperature measurements, determining the thickness of corrosive deposits. Development of drawings with the drawing of pipelines and distribution of the hot water supply system on floor plans, indicating the diameters and linking them to existing structures.
  • Inspection of heating and heat supply systems - inspection of the thermal input and central heating substations, description of the heating system and wiring diagrams of the supply and return lines, inspection of heating devices, temperature measurements, determination of the thickness of the narrowing of the live section of pipelines, drawing of the heating system on floor plans.
  • Inspection of cold water supply systems - examination of the water supply input to the building, examination of the cold water metering unit and instrumentation, description of the water supply system, determination of the thickness of corrosion deposits in pipelines, drawing of the cold water supply system on plans with diameters indicated.
  • Inspection of sewerage systems - inspection of pipelines and sanitary fixtures, inspection of ventilation risers and revisions, determination of the slope of horizontal pipelines, drawing of sewer risers and fixtures on floor plans.
  • Inspection of ventilation systems - type determination ventilation system, inspection of ventilation ducts and ventilation equipment, determination of air exchange in the inspected rooms of the building, identification of defects and comparison with regulatory requirements.
  • Inspection of waste disposal systems - inspection of waste collection chambers, establishing the integrity and tightness of the shaft, establishing compliance with the requirements of design and regulatory documentation.
  • Inspection of gas supply systems - description design diagram gas supply systems, study of documentation for gas pipelines and equipment, determination of compliance of the gas pipeline system project documentation.
  • Inspection of the technical condition of drains - a description of the drainage system, reveals unacceptable damage - blockages, tightness of joints, the presence of grates and caps, the presence of an electric heating cable.
  • Inspection of electrical networks and communications - description of the input distribution device, inspection electrical cabinets on the floors, inspection lighting fixtures, inspection of low-current systems, application electrical panels and distribution of power supply to building plans.
  • Inspection of engineering equipment - the actual condition of the equipment used is determined for various purposes. Physical and moral wear and tear is determined in accordance with identified defects and malfunctions.


2. Composition of the technical report on the inspection of engineering systems and networks

1. Explanatory note - description of the subjects engineering systems

2. Inspection of heating systems and heat supply of the building

  • description of heating and heat supply systems
  • drawing heating systems onto floor plans
  • instrumental examination of heating and heat supply systems, defects, conclusions and recommendations

3. Inspection of building ventilation systems

  • description of ventilation systems
  • drawing ventilation systems onto floor plans
  • instrumental examination of ventilation systems, defects, conclusions and recommendations

4. Inspection of water supply and fire extinguishing systems of the building

  • description of water supply and fire extinguishing systems
  • drawing water supply and fire extinguishing systems on floor plans
  • instrumental examination of water supply and fire extinguishing systems, defects, conclusions and recommendations

5. Inspection of building drainage systems

  • description of drainage systems
  • drawing drainage systems on floor plans
  • instrumental examination of drainage systems, defects, conclusions and recommendations

6. Inspection of building electrical systems

  • description of power supply systems
  • drawing electrical systems onto floor plans
  • instrumental inspection of power supply systems, defects, conclusions and recommendations

7. Results of calculations of existing loads on the building, analysis of input nodes for the possibility of increasing loads, identification of places for possible connections of new networks

8. Conclusions based on the results of the inspection of the building’s engineering systems

10. Executive diagrams - plans with applied engineering systems

In the case when a property is purchased, as well as during its reconstruction, a conclusion on the technical condition of the building and communications, drawn up based on the results of the work, during which the inspection of utility networks and building structures, becomes one of the main documents allowing to assess the possibility of stable operation of a property in new conditions.

Are examinations really necessary?

Any building requires periodic inspection of communications, both external and internal. The need to carry out such work is caused by the wear and tear of the networks, and if the operation services do not constantly monitor their condition, then the occurrence of emergency situation leading to material damage. Equally important is a comprehensive examination of structures and networks at the stage of assessing the cost of the acquired object. If external communications and internal networks are in good condition and are suitable for use for the purpose planned by the new owner, then the value of the property has the same value. If, after the purchase, it is necessary to relocate or repair networks, or reconstruct the life support systems of the building, then these costs should be taken into account when determining the final cost of the purchase. For several years now, the conclusions made by the Expertsystem company based on the results of surveys have made it possible to determine the optimal cost of the object for both parties.

In the case of reconstruction of a building, inspection of building structures and networks is mandatory. The conclusion about this work is one of the main documents in the list of initial data for design. In addition, the results of the work during which an inspection of engineering systems and building structures was carried out, compiled in the form of a report, becomes a document on the basis of which the examination bodies evaluate the correctness of the decisions included in the project, their compliance with the requirements of current standards and issue an opinion on the suitability of the documentation to implementation. And the expert’s conclusion, in turn, is necessary to obtain permission for the construction and reconstruction of a real estate property. It should be noted here that reports on technical examinations performed by the Expertsystem company are always accepted by the examination bodies without comments.

Inspection of utility networks is the key to the operability of the building’s life support systems

To assess the condition of the property, a technical inspection of the building's utility networks and building structures is carried out, which is specified when the customer draws up the work assignment and is taken into account by the contractor when developing the inspection program. When determining the operability of the building's engineering networks, the Expertsystem company performs the following work:

  • visual and instrumental inspection of water and heat supply pipelines, sewerage, steam and gas pipelines providing the property with these types of energy resources. The inspection of external networks is carried out from the point of insertion into the backbone networks specified in the act of dividing the boundaries between the energy supplier and the owner of the property, to the point where the network enters the building;
  • inspection of the water supply system, when checking the compliance of pipe diameters with as-built documentation, the presence and condition of valves, and the safety of well structures. When inspecting internal cold water supply networks, the condition of the pipework, the operability of shut-off valves, and the presence of flow meters are recorded. The technical report must indicate the presence, location and serviceability of fire hydrants, as well as the completeness of fire hydrants inside the building and the operability of the fire water supply;
  • sewer inspection, during which the condition of inspection, control and differential wells, trays is determined, the diameter and material of pipes is recorded, and the presence or absence of counterslopes between wells is checked. Internal sewerage checked to determine the degree of sealing of pipe joints and the safety of wastewater receivers;
  • inspection of ventilation and air conditioning systems, which determines the degree of wear and contamination of air ducts, the reliability of ventilation equipment, the reliability of thermal insulation of supply ventilation air intake points, the safety of louvered grilles and deflectors. The safety and operability of the fire smoke removal system is checked;
  • inspection of electrical networks, when the operability of the facility’s power supply line is checked from transformer substations where cables are connected (if there are two or more inputs) to input and distribution devices inside the building, the characteristics of the cable are recorded. Inside the building, the brands of wires and cables, the brands and serviceability of power and lighting panels, and the safety of terminal devices are determined. The presence or absence of a ground loop is also noted.

A full inspection of engineering systems is quite labor-intensive work and requires highly qualified performers. But the results and recommendations obtained will make it possible to specifically determine the amount of costs required to bring the utility networks of a property to a state that guarantees the safe operation of the building and the absence of claims from supervisory authorities. This is exactly the kind of work offered by the Expertsystem company, which employs specialists high level using modern instruments and software during examinations.

Inspection of building structures - checking the reliability of the building

Simultaneously with determining the condition of utility networks, an inspection of the structures of a building or structure is carried out, based on the results of which a conclusion is drawn about the condition of individual structural elements, and recommendations are given on ways to eliminate identified deviations from standard indicators. Depending on the scope of work provided for by the task, the following is performed:

  • inspection of foundations with determination of their depth, the size of the base, and if necessary, holes are opened and the condition of the foundation soils is checked. Most often, at the same time as the foundations, the basement is inspected, when the safety of the walls, the tightness of the entrance points of utilities into the building, the design and safety of the floors are recorded;
  • inspection of columns, crossbars, beams, floor slabs, during which their actual dimensions are measured, if necessary non-destructive methods the reinforcement of structures and the strength of concrete are determined, on the basis of which a conclusion is made about the possibility of transferring additional load to the frame elements (during the reconstruction of the building) and the suitability of the frame elements for further use. Measurements are also made of the support values ​​of structural elements in order to finally give recommendations for increasing them;
  • mandatory instrumental examination metal structures building frame. During these works, the absence of damage to the elements is checked, deflections are measured, and the state of anti-corrosion protection is determined. The supporting components of the structures are inspected, and the presence, number and diameter of bolts, nuts and washers or the length and leg of the welds are recorded. Based on the results of the work phase, when the metal structures were examined, the report proposes measures to correct the identified deficiencies, including the necessary reinforcement sketches. The results of visual and instrumental surveys are taken into account when developing design solutions for load-bearing structures steel structures reconstructed buildings;
  • inspection of walls, when the thickness and material of the fence are checked, if necessary, samples are taken to determine thermal characteristics structures and their compliance with energy saving requirements. The quality of the panel joints and the condition of the sealing materials are checked.
  • inspection of the roof of civil buildings with attics, during which the condition is examined truss structures and places of their support, integrity and presence of fastening elements of roofing materials with a pitched roof, safety of gutters and pipes, quality of thermal insulation attic floor. For a flat or low-slope roof, the roof inspection consists of assessing the condition of the rolled carpet, as well as determining the physical and mechanical characteristics existing insulation. This stage also serves as the basis for developing measures to improve the energy efficiency of the building.

Who can you trust to conduct examinations?

A comprehensive inspection of engineering systems and building structures is a very complex and responsible job, when an error can lead to quite serious consequences. Therefore, enterprises providing services of this profile must have the approval of a self-regulatory organization, confirming the presence of qualified personnel, as well as the necessary material base. The Expertsystem company also has such permission.

The Expertsystem company has been carrying out inspections of buildings and structures in Moscow and the Moscow region for more than one year, and each time the reports prepared by the company’s specialists received positive characteristics from expert bodies, and the assessment of the condition of the property became the basis for determining a fair price for the building or structure.

For directors and other high-ranking representatives of the population of the third planet from the sun


Upon completion, the customer will be issued a certificate and conclusion. As well as confirmation of completed work.

Utility network survey cost calculator
Select building type

Retail buildings Retail MFC Administrative Industrial Warehouse MFC Residential buildings

M2:

Survey
Design cost calculation
Price design work by main sections
from 10,999 m2, Vstr=31,892 m3
Settlement and explanatory note0 0
Analysis of as-built documentation, preparation of a list of defects, photographic recording of the subject of examination0 0
Power supply system, photographic recording0 0
Cold water supply system, photo recording0 0
DHW water supply system, photographic recording0 0
Drainage system, photographic recording0 0
Heating, ventilation and air conditioning, heating networks, photographic recording0 0
Communication networks, photographic recording0 0
Gas supply, photographic recording0 0
Measuring the strength of concrete using the ultrasonic method0 0
Performs opening of structures, sampling of concrete, determination of composition and reinforcement0 0
Development of building plans in PDF format based on BTI0 0
Development of plans for the placement of elements of the internal engineering systems of the building (risers VK, OV, placement of ASU, placement of utility inputs)0 0
Determination of geological conditions of the construction site (properties of foundation soils)0 0

  1. Sample for design and survey work - KP, TZ, ESTIMATED technical inspection of engineering systems up to 1500 m2
  2. Sample for design and survey work - KP, TZ, ESTIMATED technical inspection of structures up to 1500 m2
Utility network survey treatment facilities

Inspection of wastewater treatment plants– begins with drawing up technical specifications. Travels to sites Chief Engineer or the general director, who appoints specialists responsible for specific work. At the end it will be compiled detailed plan, including research results, a list of equipment with recommendations for use and, of course, modernization details.

Water supply system inspection

Water supply system inspection- a set of measures aimed at identifying the actual and obsolescence of the water supply engineering system. Includes a detailed visual inspection by specialists, control using specialized equipment and calculation work. Upon completion, a research report is drawn up detailing the results, recommendations, best practices modernization and maintenance.

Electrical networks survey

Electrical networks survey- usually initiated by the company upon the fact of excessive electricity consumption or the occurrence of an emergency. Networks, electrical installations, input devices. Based on the issued conclusion, actions are taken to improve, repair, and dismantle systems.

Utility network survey ventilation ducts

Inspection of ventilation ducts- this includes checking design documentation and working calculations to assess the feasibility of the installation. Monitoring of the system, air channels and components. Finally, if necessary, recommendations are made for effective use, repair or modernization.

Ventilation system inspection

Ventilation system inspection– comes down to measuring parameters (air flow speed, transparency, amount of suspended particles, humidity) and comparing the obtained data with the calculated data for a specific system. In case of a significant discrepancy, the system is examined for improper operation of units and components.

Ventilation inspection report

Ventilation inspection report– includes data shown by calculations when designing the system and practical parameters of the operating system. If there is a significant discrepancy between the parameters, measures are indicated to align them.

Exhaust ventilation in production

Exhaust ventilation in production– is extremely necessary for pumping the required amount of clean oxygen-saturated air into the room, removing it outside working area harmful to health human production products. Most best option of all possible ventilation systems in most types of production.

Validity engineering surveys – defined by law as 2-3 years. Results with a period of more than 3 years are included in the history of engineering surveys and are necessary for the conclusion of a repeated reconnaissance study.

Obtaining GPZU, SPOZU in Moscow

Obtaining GPZU, SPOZU in Moscow– perhaps in the Committee on Urban Planning and Architecture in the city of Moscow, or in the Moscow Committee for Architecture.

First of all, you will need to collect a package of confirmed papers. Term of provision of services from the moment of submission of documents to issue: 30 days.

What is GPZU, SPOZU

What is GPZU, SPOZU– a set of documents prepared accordingly by the responsible person, a scheme for the planning organization of a land plot or in the form of an abbreviation. Describes in detail the special special purpose specific territory, characteristics and possibilities for construction.

Samostroy

Samostroy- a structure erected without proper permitting sanctions and approvals. In places not intended for this.

How to legalize unauthorized construction

How to legalize unauthorized construction– you should start by calling a commission from the local authorities of the municipality. Which will issue the necessary confirmations. The decree legitimizing the construction will be obtained directly from the arbitration court.

Legalization of unauthorized construction

Legalization of unauthorized construction- we apply the latest research and achievements both technically and legally, so that you have the opportunity to solve the problem with minimal effort.

Temporary structure, definition

Temporary structure, definition– structures and buildings are recognized that can be moved without causing disproportionate damage. An integral structure, not connected to the ground and utilities, without a rigid foundation, which is not possible to free without destroying the structure.

List of documents for putting the facility into operation

List of documents for putting the facility into operation– this includes: an application from the developer and investor for the issuance of documents for putting the facility into operation, confirmation of acceptance, a document approving the parameters of the constructed facility in accordance with the current regulations. Papers confirming the compliance of the erected building with the technically approved project.

The procedure for registering land ownership

The procedure for registering land ownership– statements describing the purpose of acquiring rights to the site, a supporting document indicating perpetual use or lifelong ownership and justifying reason. An extract from the household register, an act on the receipt of land, is issued by the local government body. One document confirming the owner of the land. Confirmation of payment of state duty and passport of a citizen of the Russian Federation.

Composition of the redevelopment project

Composition of the redevelopment project– includes: diagram of partitions, reinforcement of openings. Water supply, sewerage and heating systems.

Plan before work begins. Measures to ensure industrial and fire safety. Confirmation of the project manager.

Cost of the redevelopment project

Cost of the redevelopment project– includes the cost of drawing up a design, sketch and working design.
Author's supervision.
A significant part is the preparation of the necessary documents.
Premises redevelopment project– pursues the goal of ensuring complete structural safety of engineering systems, operational characteristics and structures of the structure. Project design standards are regulated in accordance with GOST 21.101-97 and GOST 21.501-93.
Development of a redevelopment project– begins with the provision of documents from the Bureau of Technical Inventory and a sketch of the redevelopment.

Mezzanine

Mezzanine– in global practice, built into the main mass of the building additional room, Russian architecture - a shelf at the top of the room used to store homemade scrubs.

Sample of an object inspection report

Sample of an object inspection report- will be filled out by members of the commission that examined the property and made a conclusion. Recording data in the survey report.

Property survey report– a document confirming the readiness of the property for operation. Compiled in relation to newly erected and renovated buildings. Compiled by an authorized commission of administrative authorities. Has the task of improving the overall picture of construction.
Sample certificate of inspection of buildings and structures- a document confirming the inspection of the structure by a group of persons. To carry out the next inspection of the building, only competent persons must be involved, who are obliged to assess all identified deficiencies in the building.
Sample building inspection report– cannot be used as a supporting document. Useful to familiarize yourself with the formal rules for filling out reports.
Inspection report for building structures– confirms monitoring and inspection of the condition of building structures and structures. If a defect is identified that cannot be eliminated without dismantling the structures, a separate defect elimination report is drawn up.

Control of building structures

Control of building structures- carried out upon the construction of a building or structure. In the future, scheduled or unscheduled, it takes place in the presence of a competent commission with registration of the results. And entering data into current documentation for further analysis.

Expert opinion sample document– used for the initial conclusion. Can be used as secondary confirmation, not suitable as a final expert opinion.

Examination of buildings and structures

Examination of buildings and structures- aims to determine the residual life and technical condition of buildings and structures. Assessment of the extent to which the constructed structure meets the requirements and the extent to which it complies with industrial safety requirements.

Technical inspection report- carried out to confirm the technical inspection of the building. In order to safely operate a building, a commission of authorized members is required to confirm that the building is ready for use.
Building inspection report, sample– can be downloaded on the website of our organization. Used as a draft version of a document submitted to the competent authorities for greater accuracy and reduction of errors.
Certificate of inspection of buildings and structures- records the state of the object at the present specific moment. It lists the defects in detail. All changes are recorded in writing, after which the document is certified by the customer and interested third-party organizations. Does not reflect the overall technical condition.
Construction site inspection report– compiled at the time of a scheduled or unscheduled inspection of a construction site to identify technical details and compliance of technological operations with the technical specifications.
Defecation certificate form– is necessary exclusively in cases where a significant defect in the design of a building or structure is found. The form can be downloaded from the website of the local Rostekhnadzor authority.
Defect report– a document certifying that the building and structure cannot be used for its intended purpose. It has severe defects and needs serious repairs. Compiled by an authorized commission of specialists.
Opening in a load-bearing wall cost - the price consists of the complexity of the technical implementation. The material of the wall, brick, monolithic concrete or a panel house. Based on the material, the tool is chosen. Depending on the chosen tool and the classification of specialists, the final figure is added up.

Opening strengthening project

Opening strengthening project– is being developed design organizations– members of the SRO or authors of the building project. According to housing legislation, openings in load-bearing walls significantly affect safety. Therefore, they must be properly registered with the Moscow Housing Inspectorate.

Gain metal beams

Strengthening metal beams- can be local or general. Local reinforcement due to welding of additional stiffeners. General - creation of the lower belt of the trusses, removal of the support stress.

Concrete examination

Concrete examination- reconciliation of the actual quality of the product with the characteristics shown in the design documentation.

The highest quality strength measurements are carried out using concrete cores removed from the finished structure.
Determination of concrete strength- it is possible to determine by destructive testing, indirect non-destructive and direct non-destructive. Ultrasonic testing. Regardless of the method or equipment, the measurement error is never less than 30%.
Concrete testing laboratory– concrete is a complex composition, and therefore an analysis of each component is necessary for assessment. Laboratory selects required composition concrete depending on the technical specifications, as well as the composition of gravel, cement, sand. Determination of vibration properties and reinforcing bars.

Quality Control Methods welded joints

Methods for quality control of welded joints– distinguish between destructive control methods. A model of the product being welded is subjected to mechanical tests. And non-destructive testing: visual, pneumatic and hydraulic tests. Magnetographic and X-ray control.
Ultrasonic testing.

Flaw detection laboratory– a set of tools and methods aimed at performing flaw detection inspection by all accessible ways: destructive and non-destructive testing, ultrasonic testing, visual testing, etc.. Engaged in the development of methods for identifying defects and creating devices for practical use based on their principles.
Checking the quality of welds– There are several types of welds, depending on the purpose, the quality also varies. Accordingly, control methods.
Checking Welded Joints– carried out after cooling, may vary depending on the purpose of the connection. There are visual, ultrasonic and x-ray inspections.
Welding control– visual, ultrasound or x-ray method of examining the result welding work. To check the quality of the connection.

Design of buildings and structures

Design of buildings and structures– carried out on the basis of technical specifications, geological conditions and regulatory acts and laws.

Project documents undergo multiple checks through authorities and regulatory authorities and are approved only after general agreement.
Building project– a graphically and mathematically simulated and documented model of a building, used to create estimates and more detailed elaboration of operations during the construction of a building.
Construction design – development of the most optimal technological process in accordance with the economic models specified technical specifications and its geological capabilities.
Design of building facades– calculation and graphic work, as well as a general and sectional plan of the building facade, taking into account the specific site and the specifics of its operation and construction.
Building design price– design cost, a complex set of key costs (work of specialists, costs of work, etc.)
Building design cost– the total cost of creating a project with the participation of technical specialists and developing solutions. As well as overhead, legal and other expenses.
Typical projects– we finalize, clarify and rework standard projects to suit your tasks, technical solutions and wishes. Standard project Usually the basis of all private projects is used to reduce the same type of work.
Shopping center project– compiled taking into account supply chains, human flows, and city communications. Closely integrated with the economy of the residential area and infrastructure facilities.
Project working documentation, working draft - a set of transitions, operations and plans from different angles for the production of specific technical actions(masonry, finishing, facade plan, sectional plan).
Project documentation what is it– a set of graphic and calculation materials that constitute the apotheosis of preliminary work in preparation for the construction of a building and structure.
Design of industrial facilities- similar to other types of design, but taking into account financial and estimate analysis, calculations of product sales. Design with the implementation of all possible measures for the successful implementation of the project.
Production design- in accordance with the requirements of regulatory and technical acts. Taking into account the use of production equipment and materials. The basis is a project developed specifically for you, taking into account the preferences and recommendations of the customer. No standard solutions.

Measurements

Measurements– a set of actions aimed at accurate measurement dimensions of the room (width, height, volume, area). Necessary for repairs, cost assessment installation work. When installing communications, cosmetic repairs and other actions.

Premises measurements– the primary procedure is integral during inspection, repair, and redevelopment. Other technical or legal actions in relation to the premises.
Room measurements cost– this includes the cost of paying specialists, overhead costs and depreciation of equipment. And also the price varies significantly depending on the size.

Offer other types of cooperation. Fine!



 
Articles By topic:
How and how long to bake beef
Baking meat in the oven is popular among housewives. If all the rules are followed, the finished dish is served hot and cold, and slices are made for sandwiches. Beef in the oven will become a dish of the day if you pay attention to preparing the meat for baking. If you don't take into account
Why do the testicles itch and what can you do to get rid of the discomfort?
Many men are interested in why their balls begin to itch and how to eliminate this cause. Some believe that this is due to uncomfortable underwear, while others think that it is due to irregular hygiene. One way or another, this problem needs to be solved.
Why do eggs itch?
Minced meat for beef and pork cutlets: recipe with photo
Until recently, I prepared cutlets only from homemade minced meat.  But just the other day I tried to cook them from a piece of beef tenderloin, and to be honest, I really liked them and my whole family liked them.  In order to get cutlets
1 2 3 Ptuf 53 · 10-09-2014 The union is certainly good. but the cost of removing 1 kg of cargo is still prohibitive. Previously, we discussed methods of delivering people into orbit, but I would like to discuss alternative methods of delivering cargo to rockets (agree with