Panel houses series p 44t layout. Standard house series P44T with apartment layouts. Exterior decoration and design features of the series

Series panel houses P-44T is a new generation of the popular Moscow series of houses. It is the most common modern standard series in Moscow. Bay windows were added to the layouts, the quality improved exterior finishing building, an attic floor was added. The series was designed in the mid-1990s. Years of construction: from 1997 to present. In total, about 800 houses were built. Regulatory period operation of the house - 100 years.

In Moscow, houses of the P-44T standard series are mainly built in areas of mass development: Izmailovo, Lefortovo, Perovo, Nagatino, Yuzhnoye Chertanovo, Zyuzino, Cheryomushki, Khovrino, Koptevo, Beskudnikovo, Degunino, Sviblovo, Medvedkovo, Yurlovo, Alekseev, Solntsevo, Ochakovo , Kuntsevo, Fili, Shchukino, Zelenograd, as well as on the street. 1905, st. Borisovskie Ponds, and Nizhegorodskaya st.

In the Moscow region, houses of the P-44T series were built in the cities of Zheleznodorozhny, Balashikha, Lobnya, Krasnogorsk, Lyubertsy, Moskovsky, Kotelniki, Reutov, Odintsovo, Khimki, Shcherbinka, as well as in the village. Bear Lakes (Shchelkovsky district), village. Blue and village Brekhovo (Solnechnogorsk district), village. Pykhtino and residential complex "Butovo-Park" (Leninsky district).

All rooms in the apartments of the P-44T series houses are isolated. All apartments have bay windows and spacious loggias. Each entrance has one passenger and one freight-passenger elevator. IN one room apartments Oh The bathrooms are combined, the rest are separate. The stairs are smoke-free, there is no fire balcony.
The kitchen stove is electric, natural exhaust ventilation, units in the kitchen and bathroom. Garbage chute on the stairs, with loading valve on the site.

The P-44T series of houses differs from its predecessor (series) in increased thermal insulation of the walls, a ventilation duct in the hallway, glazed loggias, bay windows and half-bay windows, as well as a recognizable brick exterior finish; an attic floor is available for living in the P-44T series houses.

P-44T, like all other series of the family, was developed specifically for. The first house of the P-44T series was built in 1997 on the street. Marshal Vasilevsky (Shchukino). “Visiting card” is a multi-storey residential complex on the Rubtsovskaya embankment of the Yauza (project I-1774) built from block sections of the P-44T and .

Design characteristics And appearance houses of the P-44T standard series are in many ways similar to houses of the series, , .

In 2005, on the basis of the P-44T standard series, a project was developed for standard block sections of the series, where each section has one step less (6 steps), and there are only one and two-room apartments. Currently, this series is being built more actively within the Moscow Ring Road.

Detailed characteristics of the series

Entrancesfrom 1
Number of storeysfrom 9 to 25, the most common options are 14, 17.
Ceiling height2.70 m.
ElevatorsOne passenger (400 kg.) and one cargo-passenger (630 kg.).
BalconiesGlazed loggias in all apartments except the first floor. Bay windows and half-bay windows in all two-room and three-room apartments.
Apartment per floor4
Years of constructionfrom 1997 to present
Built housesMoscow: about 600,
Moscow region: about 200 (including those under construction).
Apartment areas1-room apartment total: 37-40 m², living: 19 m², kitchen: 7.4-8.4 m²
2-room apartment total: 52-64 m², living: 32-34 m², kitchen: 8.3-13.2 m²
3-room apartment total: 70-84 m², living: 44-54 m², kitchen: 10-13.2 m²
BathroomsOne-room apartments have combined apartments, two- and three-room apartments have separate apartments. Bathtubs: standard
StairsSmoke-free, with access to a fireproof balcony.
Garbage chuteWith loading valve on each floor.
VentilationNatural and forced exhaust, in the kitchen and bathroom.
Walls and ceilingsExternal walls - reinforced concrete three-layer panels 30 cm thick. Internal inter-apartment and interior walls - reinforced concrete panels 16 and 18 cm thick. Gypsum concrete partitions 8 cm. Floors - reinforced concrete slabs 14 cm thick.
Load-bearing wallsLongitudinal inter-apartment (as well as inter-room in end apartments) and transverse (inter-apartment, inter-room and inter-balcony).
Colors and finishesRed with sand, bay windows and loggias – white
Brick cladding, lower floors – stone cladding
Roof typeFlat-pitched with tiles. Technical floor: above the upper residential floor. Possibility of arrangement of an attic apartment.
AdvantagesHeating appliances with temperature regulators, copper electrical wiring, hot water supply with top spill, fast pace of construction (1st floor in 3 days).
FlawsThe quality of installation of individual elements of external walls in some buildings, narrow room in two-room linear apartments (with windows on 1 side)
ManufacturerMoscow house-building plant No. 1 (DSK-1)
DesignerMNIITEP (Moscow Research and Design Institute of Typology and Experimental Design)

These dimensions were taken by me personally in my apartment at the stage of finishing the installation of the house. Regarding the size, it is worth noting that the higher the floor, the larger area apartments like the walls on upper floors darker. In my case, the area of ​​the apartment is 0.5 larger square meters from the area indicated in preliminary agreement buying and selling an apartment and this is more pleasant than getting a minus in the area of ​​​​an apartment located on one of the lower floors.

Now let's move directly to the layout of the apartment and compare it with another offer for a three-room apartment in a building of the 111-M series from the GVSU company. The dimensions of a three-room apartment are presented in the following figure:

Comparison of 3-room apartments of the P-44T and 111-M series

The area of ​​these apartments is almost the same - who likes which one more. This is a matter of taste and needs, but I liked the layout of the P-44T better. Why?

1. Location of the bathroom.

In P44-T the bathroom is located in the corridor near the hallway, and in 111 between two rooms. In the second option, in the rooms near the bathroom you will always hear the noise of water, doors opening and closing, which will disturb the silence in these rooms.

2. Kitchen.

In P44-t and 111-M the kitchens have similar areas, but in the first version the kitchen has a bay window. Thanks to the bay window, there will always be light in the kitchen, and the kitchen will have a more beautiful appearance.

3. Corridor.

In P-44t the corridor is wider and shorter, which will allow you to install a good closet for out-of-season clothes and other things, but in 111 the corridor is narrow and long, which does not allow you to use its area to your advantage.

4 rooms

What I liked about P-44T is that the rooms are wider, which allows for more efficient use of their space, while in 111-M the rooms are quite narrow, which does not allow furniture to be placed on both sides of the rooms. Also in P-44T all rooms different sizes, thanks to this you will have more “maneuvers” in choosing the purposes of each of the three rooms.

5. Balconies

The P-44T has two fairly spacious balconies, while the 111 has only one. It is worth noting that the cost per square meter of cold rooms is, as a rule, half lower than that of residential premises, which means that you pay half as much for balconies and at the same time get more square meters.

6. Ventilatorion boxes

The location of the ventilation ducts in both options is quite good, but note because in P-44t the box is located in the corridor and if the house is higher than 17 floors, then the plus turns into a minus, since a second box appears next to the first and the corridor opposite the bathroom becomes narrow^

If you have any questions, ask them in the comments - I will definitely answer them!

Wall material: panel with brick cladding
Number of sections (entrances): from 1. Sometimes several entrances in one building are block sections of the P-44T series, and others (central and/or corner) are from block sections of other series: P-44K, P-44TM/ 25 (TM-25)
Number of floors: 9-25, the most common options are 14, 17. The first floor is most often residential
Ceiling height: 2.70 m.
Elevators: passenger 400 kg and cargo-passenger 630 kg, in 20-25-storey sections (entrances) - 2 cargo-passenger and passenger (the modification was called P-44T/25)
Balconies: in all apartments, starting from the 2nd – 3rd floor, there are glazed loggias, in 2- and 3-room apartments there are also bay windows and half-bay windows
Number of apartments per floor: 4
Years of construction: from 1997 to present. time

Panel houses of the P-44T standard series in Moscow were built both in new areas of mass development: Maryinsky Park, Lyublino, Northern and Southern Butovo, Mitino, Novokosino, Novoe Kozhukhovo, Zhulebino, Nekrasovka, village. Severny, Khodynka, and in old areas where massive demolition of five-story buildings and dilapidated buildings was carried out and is being carried out: Khovrino, Koptevo, Beskudnikovo, Degunino, Sviblovo, Medvedkovo, Yurlovo, Alekseevo, Izmailovo, Lefortovo, Perovo, Nagatino, Yuzhnoye Chertanovo, Zyuzino , Cheryomushki, Solntsevo, Ochakovo, Kuntsevo, Fili, Shchukino, Zelenograd, st. 1905, st. Borisovsie Ponds, Nizhegorodskaya st. Also in a number of other areas (including in the Central Administrative District) houses of the P-44 series were built point by point
In the Moscow region, new buildings of the P-44T series have been built and are being built in the cities of Zheleznodorozhny, Balashikha (microdistrict 1 May, microdistrict 22 “Balashikha-Park”, etc.), Lobnya, Krasnogorsk, Lyubertsy, Moskovsky, Kotelniki, Reutov (including including microdistrict Novokosino-2), Odintsovo (including Nemchinovka), Khimki, Shcherbinka, as well as in the village. Bear Lakes (Shchelkovsky district), village. Blue and village Brekhovo (Solnechnogorsk district), village. Pykhtino and Butovo-Park residential complex (Leninsky district)
Number of buildings built in Moscow: about 600, in the Moscow region - about 200 (including those under construction). The P-44T series is the most common in Moscow among all modern standard series of houses. The number of municipal houses built for resettlers from the demolished stock, for young families, etc. – about 50%
The standard service life of a house (according to the manufacturer) is 100 years

Area of ​​1-room apartments: total: 37-40 sq. m., residential: 19 sq. m., kitchen: 7.4-8.4 sq. m. (in the 25-storey modification – 9 sq. m.)
Area of ​​2-room apartments: total: 52-64 sq. m., residential: 32-34 sq. m., kitchen: 8.3-13.2 sq. m. (in the 25-storey modification – 12.8-13.8 sq. m.)
Area of ​​3-room apartments: total: 70-84 sq. m., residential: 44-54 sq. m., kitchen: 10-13.2 sq. m.
All rooms in apartments of houses of the P-44T series are isolated
Bathrooms: in 1-room apartments - combined, in 2- and 3-room apartments - separate, bathtubs: standard, 170 cm long.
Staircases: smoke-free, in 20-25-storey sections (P-44T/25) equipped with common balconies. Garbage chute: with loading valve on each floor
Type kitchen stove: electric. Ventilation: natural exhaust, ventilation units in the bathroom and hallway
Walls: external reinforced concrete three-layer panels (concrete - polystyrene insulation - concrete) with a total thickness of 30 cm (the thermal insulation of which, according to the manufacturer, is equivalent to brick wall 90 cm thick).
Load-bearing walls: longitudinal inter-apartment walls (as well as interior walls in end apartments) and all transverse walls (inter-apartment, inter-room and inter-balcony walls)
Type of sections: end, row (ordinary, P-44-1) and rotary (corner). The entrance where the electrical panel is located has an entrance from 2 sides
Number of steps in a section (entrance): 7, step width (distance between two adjacent load-bearing walls): 300 cm (in the 3 central spans of each section), 360 cm (in the rest)
Color options external walls: dark orange, light red, sand, lower floors - gray with stone trim, bay windows and half bay windows - white
Roof type: flat-pitched with BRAAS DSK1 tiles. Technical floor: above the upper residential floor

Distinctive features: the P-44T series of houses differs from its predecessor - the P-44 series (which was built in 1979-2000) by increased thermal insulation of walls, increased kitchen areas due to the placement of the ventilation duct into the corridor, bay windows, as well as a recognizable brick exterior finish
Other advantages: heating devices with temperature controllers, copper electrical wiring, hot water supply with top spill, world standards for capital construction and fire resistance (1st class), fast pace of construction (1st floor in 3 days): www.site experts did not identify any case of long-term construction of houses of this series
Disadvantages: quality of installation of individual elements of external walls in some buildings, narrow smaller room in 2-room apartments - “lines” (with windows on 1 side)
Manufacturer: Moscow house-building plant No. 1 (DSK-1)
Designer: MNIITEP (Moscow Research and Design Institute of Typology and Experimental Design)
The design characteristics and appearance of houses of the P-44T standard series are in many ways similar to houses of the P-44TM, P-44K series
Apartments in new buildings of the P-44T series can also be purchased with municipal finishing

The first house of the P-44T series was built in 1997 on the street. Marshal Vasilevsky (Shchukino). One of the most recognizable multi-storey residential complexes in Moscow with spiers on the Rubtsovskaya embankment of the Yauza (project I-1774) was built from block sections of the P-44T and P-44M series
In 2005, on the basis of the standard P-44T series, a project of standard block sections of the P-44K series was developed, where each section has 1 step less - 6 steps (“6-module”), and, accordingly, only 1- and 2-room apartments. Currently, this series is being built more actively within the Moscow Ring Road
A 5-module was also developed (5-step version of P-44T), where 1-room apartments are actually so-called studios with a total area of ​​23-28 square meters. m. The 5-module (www.site experts adopted the code name P-44-5M for it) has not yet gone into mass production
Rating website of the P-44T type series: 8.2 (on a 10-point scale)
Photo: www..dsk1.ru, www.morton.ru

It began to be built in 1997. and to the present time. It has its own modification, which differs from it only in the number of floors - this is the P-44T/17 series.

The P-44T panel house consists of corner and row sections of four apartments, where a 1-room apartment has a living space size of 19m2, a kitchen of 7-9m2, combined bathrooms; 2-room apartment - 30-34 m2, kitchen - 8-13 m2, separate bathrooms; 3-room apartment - 44-54 m2, kitchen - 10-13m2, also separate bathroom. All rooms in the apartments of the P-44T series houses are isolated. All apartments have bay windows and spacious loggias. The internal walls are made of prefabricated reinforced concrete panels 16 cm and 18 cm thick. Three-layer external walls hanging panels with polystyrene foam insulation and a heat-reflecting metallized film inside the insulation, total thickness 30 cm; the façade side is lined with brick-like tiles, starting from the second floor. Partitions made of many materials: tongue-and-groove or foam concrete blocks, plasterboard sheets on a metal frame, gypsum concrete rolled panels, but most often gypsum concrete, they are all the same thickness - 8 cm. Floors - reinforced concrete slabs 14 cm thick.


Series of residential buildings P-44T
has various disadvantages, such as a narrow room in two-room linear apartments (with windows on 1 side), the seams between the panels require additional greasing (otherwise it will be cold). The possibilities for redevelopment in a house of this type are very seriously limited. Almost all walls are load-bearing. However, the following possibilities for permissible redevelopment without detrimental effects on supporting structures remain:

  • In three-room apartments the partition between big room and the corridor is non-structural.
  • The plumbing block is made of gypsum and can be dismantled and/or modified.
  • In houses built after 2007, a special niche is provided in the load-bearing panels between the kitchen and the room in some apartments for carrying out doorway(“wafer”), which can be dismantled.


Nevertheless, this series also has a number of advantages: bay windows, copper electrical wiring, natural exhaust ventilation, hot water supply with a top spill were added to the layout, the appearance acquired a special color - red with sand, bay windows and loggias were painted white. For living in houses of the P-44T series, an attic floor is available. A modern security system has appeared that responds to the opening of office premises, flooding or the threat of a fire.

Each entrance has one passenger and one freight-passenger elevator, and in 20-25-storey sections (entrances) - 2 freight-passenger elevators and a passenger elevator. The number of entrances is from 1 to 8. The stairs are smoke-free, there is no fire balcony. The garbage chute is located on the stairs, with a loading valve on the landing.

The service life of the P-44T series house is about 100 years, so you shouldn’t hope for demolition in the near future.

One of the most popular housing projects on the market of new buildings in the capital and in the Moscow region has become the P-44T series. Houses of this type were actively built both in new areas (Lyublino, Severnoe Butovo, Novokosino, Maryinsky Park), and in places where dilapidated housing stock was demolished in areas of old buildings (Medvedkovo, Lefortovo, Shchukino, Yuzhnoye Chertanovo, etc.). In total, about six hundred houses of this series were built in Moscow, and about two hundred in the Moscow region.

Houses P-44T compare favorably with the buildings of the basic version P-44 (built before 1999) by glazing loggias, the presence of half-bay windows and bay windows, improved thermal insulation of external panels and an improved water supply system, placement vent in the hall.

In general, the houses of this series are considered a very successful engineering and architectural project, they answer international standards in terms of fire safety and capital (class 1), and therefore continue to be actively built at the present time. The structural strength of the houses is also evidenced by the fact that the developer indicates “100 years” as the estimated lifespan of the house. The combination of the relatively low cost of square meters and a fairly high level of comfort, as well as the high speed of construction of apartments in the P-44T series, is attractive.





Exterior decoration and design features of the series

The P-44T series of multi-section houses can be easily recognized by the aesthetic “brick” façade finishing, which enhances the appearance concrete structure. Exterior decoration houses are usually done in dark orange or light sand tones, and the decoration of the lower floors, bay windows and half-bay windows is in gray and white colors.

The undeniable advantages of high-rise buildings of the P-44T series are: high level sound insulation of external panels, presence of individual regulators for heating devices, modern fire protection systems, devices for warning about fires, floods, responding to the opening of technical floor doors, basements, electrical panels, elevator shafts). Due to the fact that concrete panels have the most even surfaces in comparison with panels in other high-rise buildings, construction costs are significantly reduced. interior decoration apartments

However, some reviews indicate that in new houses, during shrinkage, cracks form at the joints of panels and sometimes depressurization of the “seams” occurs. Therefore, when buying an apartment, you need to pay attention to the quality of the installation of panels.

Features of apartment layouts

As in most modern new buildings, rooms in P-44T houses are isolated. In addition, in some houses built under this project, apartments are located on attic floor, attractive to many potential real estate buyers.

The pitch of the transverse walls has been increased to 4.2 m, and the thickness interior walls- 14 cm and 18 cm, provides good sound insulation between rooms. Apartments have separate bathrooms(except for combined bathrooms in one-room apartments). Apartments with ready-made municipal finishing are available for purchase.

The disadvantage of the P-44T, like other panel houses, remains the presence large number load-bearing walls inside apartments, which does not allow redevelopment at the request of homeowners. It is strictly forbidden to cut window sill blocks or make openings in load-bearing walls in houses of this series.





Specifications

Parameter

Meaning

Alternative name:
P-44T
Construction regions:

Moscow and Moscow region

(Koptevo, Sviblovo, Medvedkovo, Izmailovo, Novoe Kozhukhovo, Nekrasovka Krasnogorsk, Lobnya, Balashikha, Zheleznodorozhny, Lyubertsy, Khimki, Moscow, Odintsovo, Solnechnogorsk, in the village of Medvezhye Ozera, the village of Brekhovo, the village of Goluboe)

Construction technology:
Panel
By construction period: Modern
Years of construction: From 1997 to present
Demolition prospect: Demolition is not envisaged even in the long term
Number of sections/entrances: From 1 to 8 (combinations of entrances of different series are possible - P-44T, P-44K, P-44TM/25 in one house)
Number of floors: 9-25 (the most common options are 14, 17)
Ceiling height:
2.70-2.75 m
Balconies/loggias:

Above the 2nd – 3rd floor there are glazed loggias in all apartments.

2- and 3-room apartments have bay windows and half-bay windows.

Bathrooms:
Combined - in one-room apartments, separate - in 2- and 3-room apartments.
Stairs:
Smoke-free
Garbage chute:
Garbage chute equipped with a loading valve on each floor
Elevators:

2 elevators: passenger (400 kg) and cargo-passenger (630 kg).

In 20-25-storey entrances there are 2 cargo and passenger entrances and a passenger entrance.

Number of apartments per floor:
4
Apartment areas:
Shared/living/kitchen
1-room apartment 37-39/19/7-9
2-room apartment 51-61/30-34/8-13
3-room apartment 70-84/44-54/10-13
Ventilation:
Natural exhaust with a duct in the hallway
Walls and cladding:
Exterior walls- three-layer reinforced concrete panels (concrete - polystyrene - concrete) up to 30 cm thick with increased thermal insulation
Inter-apartment and interior load-bearing– Reinforced concrete panels 16 and 18 cm thick. Large-sized floors 14 cm thick across the width of the rooms
Facing exterior walls “brick-like”, primary colors - dark orange, light sand
Roof type:
Flat-pitched or tiled-pitched roofing in brown or green (manufactured by BRAAS DSK-1).
Manufacturer:
DSK-1
Designers:
MNIITEP (Moscow Research Institute of Typology and Experimental Design)
Advantages:
Improved sound insulation of external panels and “seams”, regulators on heating devices, copper wiring, use of technology closed joint, compliance with international standards for capital construction and fire safety, modern systems security.
Flaws:
Unsatisfactory quality of installation of external walls in individual sections.

Igor Vasilenko



 
Articles By topic:
How and how long to bake beef
Baking meat in the oven is popular among housewives. If all the rules are followed, the finished dish is served hot and cold, and slices are made for sandwiches. Beef in the oven will become a dish of the day if you pay attention to preparing the meat for baking. If you don't take into account
Why do the testicles itch and what can you do to get rid of the discomfort?
Many men are interested in why their balls begin to itch and how to eliminate this cause. Some believe that this is due to uncomfortable underwear, while others think that it is due to irregular hygiene. One way or another, this problem needs to be solved.
Why do eggs itch?
Minced meat for beef and pork cutlets: recipe with photos
Until recently, I prepared cutlets only from homemade minced meat.  But just the other day I tried to cook them from a piece of beef tenderloin, and to be honest, I really liked them and my whole family liked them.  In order to get cutlets
Schemes for launching spacecraft Orbits of artificial Earth satellites